My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-08_REPORT - M1987049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1987049
>
2011-09-08_REPORT - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:34 PM
Creation date
9/12/2011 7:41:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REPORT
Doc Date
9/8/2011
From
Ready Mixed Concrete Co.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bromley Lakes Pit 2011 Annual Report <br />Prepared for: <br />Ready Mixed Concrete Company <br />Prepared by: <br />Michael J. Hart, Hart Environmental <br />Permittee Name: Ready Mixed Concrete Company (RMCC) <br />Permit Number: M- 1987 -049 <br />Operation Name: Bromley Lakes Pit <br />Anniversary Date: September 29, 2010 <br />Annual Fee Due: $791.00 <br />County: Adams <br />RMCC's Bromley Lakes Pit was not actively mined during the 2010 -11 reporting <br />period of the Annual Report. Mining activity during the reporting period occurred in the <br />northeast portion (Phases 5 and 6A) of the Ergers Pond Pit (DRM &S Permit #M -1998- <br />036) which is contiguous to the northerly permit boundary of the Bromley Lakes Pit. <br />Sand and gravel, excavated from Ergers Pond, was transported by conveyor across the <br />Bromley Lakes Pit to the sand and gravel processing plant located thereon. Wash fines <br />from the processing plant were discharged into the Bromley Lakes settling pond located <br />in Cell 2. In August, 2011, excess overburden from Ergers Pond was used to back fill <br />portions of the southwest portion of Cell 2 (see enclosed drawing). <br />Weed control at Bromley Lakes, during the period of this annual report, included <br />mowing and spraying. <br />Mining in the Bromley Lakes Pit is anticipated to resume in the fall of 2011 when <br />pit preparation is scheduled to begin. <br />
The URL can be used to link to this page
Your browser does not support the video tag.