Laserfiche WebLink
August 18, 2011 C- 1982 -056 /Foidel Creek Mine 1DM <br />Deakins Pit Crest of North Stockpile with Samples being Collected <br />According to the July 25, 2011 Minerals Program inspection report the Deakins Pit operator stated that prior to using the <br />imported material for backfill, clasts larger than 1.5 inches are removed by screening and that the remaining material is <br />blended with dirt in order to reduce the coal component. The second stockpile contained the same type of coal material <br />as the first with the exception of approximately 1 " -2" of cover material. This stockpile consisted of approximately 25-40 <br />CY of material. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 7 of 25 <br />