My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-18_REVISION - C1983059
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1983059
>
2011-02-18_REVISION - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:06 PM
Creation date
9/9/2011 8:19:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
REVISION
Doc Date
2/18/2011
Doc Name
Email Regarding Loadout Midterm
From
DRMS
To
Jim Kiger
Type & Sequence
MT6
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dudash, Joe <br />From: Stark, Jim <br />Sent: Wednesday, February 23, 2011 9:20 AM <br />To: Dudash, Joe <br />Subject: , RE: Terror Creek Loadout Midterm <br />OK. Thanks. <br />From: Dudash, Joe <br />Sent: 23 February, 2011 09:20 <br />To: Stark, Jim <br />Subject: FW: Terror Creek Loadout Midterm <br />I haven't heard back from Jim Kiger yet concerning this e-mail. I need to send out the midterm review findings today so I <br />will just say in the findings that the bond estimate is still being reviewed. I also included a question /comment in the <br />midterm findings concerning the storage tanks. It might be better to wait for Jim Kiger's response before doing the cost <br />estimate anyway. Thanks! <br />From: Dudash, Joe <br />Sent: Friday, February 18, 2011 3:00 PM <br />To: Stark, Jim <br />Subject: FW: Terror Creek Loadout Midterm <br />I sent this e-mail to Jim Kiger concerning the Terror Creek Loadout Midterm Review. It may affect the bond calculation. <br />I'll let you know what he says. Also, The operator installed a bar gate on a swivel post at the main entrance and a tubular <br />pipe fence gate at the east entrance. They also placed some large rocks along the east side near the east entrance to <br />block access to the site. I don't know if these items should be in the bond calculation or whether they are insignificant. I <br />think I have some photos if you need them. Please let me know what you think. Thanks! <br />From: Dudash, Joe <br />Sent: Friday, February 18, 2011 2:38 PM <br />To: iim.kiger(aoxbow.com <br />Subject: Terror Creek Loadout Midterm <br />6,000 gallon fuel tank <br />4,000 gallon water tank <br />1,500 gallon antifreeze tank <br />6,000 gallon antifreeze tank <br />(2) 350 gallon diesel and unleaded fuel tanks <br />7,000 gallon tank <br />1 <br />Hello, Jim. I am working on the midterm review for the Terror Creek Loadout and I have a question. The current bond <br />calculation from Permit Renewal No. 5 lists the following tanks on site: <br />Is this still the case? I know there was a change but I can't remember if the changes were made before or after Permit <br />Renewal No. 5. Thanks! <br />
The URL can be used to link to this page
Your browser does not support the video tag.