My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_REVISION - M1995026 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995026
>
2011-09-07_REVISION - M1995026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:32 PM
Creation date
9/9/2011 7:46:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995026
IBM Index Class Name
REVISION
Doc Date
9/7/2011
Doc Name
Submittal
From
Custer County
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUSTER COUNTY ROAD AND BRIDGE <br />213 N. 4TH STREET <br />P.O. BOX 1669 <br />WESTCLIFFE, COLORADO 81252 <br />OFF: 719- 783 -2281 <br />FAX: 719- 783 -0391 <br />Division of Reclamation, Mining & Safety <br />Dept. of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />July 14, 2011 <br />Re: Permit No. M- 1995 -026 <br />Attention: Mr. Jerry Ebert <br />Respectfully, <br />Dave Trujillo <br />Custer County Road & Bridge <br />Road Supervisor <br />rbofficePcenturvtel.net <br />DT /dw7 /14/11 <br />ll <br />SEP 0 7 2011 <br />Division of Reclamation, <br />Mining and Safety <br />Enclosed you will find a check for $216.00 for a revision of our mining plan at our gravel pit M -093. I <br />have also included a map to show our proposed work for 2012, but please feel free to contact me if you <br />have any questions. <br />Please contact our office if you have any concerns with this proposed plan or if you would like to visit <br />the operation. <br />-7-go <br />We will be starting reclamation on phase 1 soon, reclaiming approximately the South 5 acres. We intend <br />to use the remaining area in phase 1 (the North half) as our staging area. We have stored the top soil <br />from phase 1 on the West part of the phase 2 section (just East of phase 1). Our operation plan is to <br />move to the phase 4 section next (rather than to phase 2) and will be using the top soil from phase 4 to <br />reclaim phase 1, leaving phase 2 as it is now and saving us some work by not moving the top soil twice. <br />Moving to the phase 4 section will also allow us to use the haul road and emergency exit roads without <br />making too many changes to our traffic plan at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.