Laserfiche WebLink
September 4, 2011 <br />CO Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />De, ver, CO 80203 <br />: Jared Ebert <br />RE: M- 2009 -076 Hukill Gulch Milisite <br />Subject:er Installation Report Transmittal <br />Dear Mr. Ebert: <br />Sincerely, <br />Venture Resources, Inc. <br />Ryan J. McHale, PE <br />Vice President <br />Venture Resources, Inc. <br />PO Box 1974 (3 619 -6323 <br />Idaho Springs, CO 80452 Fax: (3 4 <br />ventureresourees@att.net <br />Attachments: Colorado Lining International "Installation Reports for Hukill Gulch Millsite" <br />SE 07 X011 <br />hotoion ofg d safety <br />n ' <br />Wiioin9 <br />Please find attached a completed "Installation Report" concerning the tailings impoundment composite liner system. <br />The report was prepared by the installation contractor, Colorado Lining International. This report has daily logs, <br />seam testing results, repair data, destructive sample tests, HDPE panel placement log w/ drawing, and acceptance <br />sign -offs. <br />We are in receipt of your pre- and post- liner installation inspection reports. Based on this information, we now <br />consider the impoundment approved for the deposition of mill tailings per the terms in our permit M- 2009 -076. If <br />you have any additional questions please contact me at 303 - 619 -6323 or email: ventureresources @att.net. <br />Page 1 of 1 <br />