My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2011-09-07_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:58 PM
Creation date
9/8/2011 1:35:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
9/7/2011
Doc Name
Proposed Decision & Findings (RN6)
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1 The Review Process <br />3.1.1 Initiation of Renewal <br />3.1.2 Public Notice <br />3.1.3 Application Reviews and Responses <br />3.1.4 Status of Permit Stipulations <br />2. Proposed Decision <br />The Colorado Division of Reclamation, Mining and Safety proposes to approve this Application <br />for renewal of a valid existing permit. This decision is based on a finding that the operations will <br />comply with all requirements of the Colorado State Program as found in the Colorado Surface <br />Coal Mining Reclamation Act, Colorado Revised Statutes 34 -33 -101 et seq., and the Regulations <br />promulgated pursuant to the Act. If no request for a formal hearing is made within thirty (30) <br />days of the first publication of the issuance of this proposed decision, then this decision becomes <br />final. Acceptable surety has been submitted by the applicant. The Application, all supporting <br />documentation and any stipulations or conditions will become a binding part of the Permit. <br />3. Summary <br />The Division of Reclamation, Mining and Safety (Division) notified the Coors Energy Company <br />(CEC) on February 1, 2011 that the existing Permit for the Keenesburg Mine would expire on <br />November 3, 2011. CEC responded on April 21, 2011 with an application for permit renewal. <br />The Division deemed the Application complete on April 29, 2011. <br />Public notice of submittal of the Application was published four times in The Fort Lupton Press <br />between May 18, 2011 and June 8, 2011. Notice that the Application was considered complete <br />for the purposes of filing was provided by the Division, in accordance with Title 34, Article 33, <br />Section 118, Paragraph 3, of the Colorado Revised Statutes. • <br />The Application was reviewed for adequacy, and the Division identified nine items requiring <br />update or clarification in a letter to CEC (dated June 27, 2011). CEC provided acceptable <br />responses to all nine items in a submittal dated July 25, 2011. <br />There are no stipulations on this permit at this time. Stipulations 1 through 4, 6 through 16, and <br />18 of the original permit were resolved during the first five -year permit term. Stipulations 19, 22 <br />and 27 were resolved during the second five -year permit term. Stipulations 5, 17, 20, 21, 23, 24, <br />25, 26, 28, 29, 30, 31 were resolved during the third five -year permit term. <br />
The URL can be used to link to this page
Your browser does not support the video tag.