Laserfiche WebLink
Table of Contents <br />1. Introduction , 1 <br />1.1 Legal Description 1 <br />1.2 Acronyms 2 <br />2. Proposed Decision 3 <br />3. Summary 3 <br />3.1 The Review Process 3 <br />3.1.1 Initiation of Renewal 3 <br />3.1.2 Public Notice 3 <br />3.1.3 Application Reviews and Responses 3 <br />3.1.4 Status of Permit Stipulations 3 <br />3.1.5 Technical Revisions (TR) 4 <br />3.1.6 Minor Revisions (MR) 4 <br />3.1.7 Bond Releases (SL) 4 <br />3.1.8 Applicant Violator System 5 <br />3.2 Description of the Environment 5 <br />3.2.1 Maps 5 <br />3.2.2 General, Disturbed and Affected Area 5 <br />3.2.3 Resource to be Mined 6 <br />3.2.4 Geology, Soils and Topography 6 <br />3.2.5 Surface and Ground Water 6 <br />3.2.6 Climate 7 <br />3.2.7 Vegetation, Wildlife and Land Use 7 <br />3.3 Description of the Operation and Reclamation Plans 7 <br />3.3.1 Topsoil Stripping and Replacement Depths 7 <br />3.3.2 Revegetation Techniques 8 <br />3.3.3 Mining Techniques, Directions, Mine Life, Production Rates 8 <br />3.3.4 Surface Handling of Coal (crush, screen, wash) 8 <br />3.3.5 Disposal of Waste 9 <br />3.3.6 Other Reclamation 9 <br />3.3.7. Water Rights and Usage 9 <br />Findings of the Division of Reclamation, Mining and Safety 10 <br />Explanation of Findings 10 <br />Section A - Rule 2.07.6 10 <br />1. Accuracy and Completeness 10 <br />2. Feasibility 10 <br />3. Assessment of Probable Cumulative Hydrologic Impacts 10 <br />4. Relative Location 11 <br />5. National Register of Historic Places and Public Parks 11 <br />6. Mineral and Surface Estates 11 <br />7. Compliance with Laws, Rules and Regulations 11 <br />8. Determination of Willful Violations 12 <br />9. Consistency with Adjacent Activities 12 <br />10. Reclamation Liability 12 <br />11. Prime Farmlands 12 <br />