Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />56b <br />56c <br />56d <br />56f <br />Seal and Abandon 7 Exploration Boreholes <br />BOREHOLE <br />- - <br />56.00 <br />$22,154.62 <br />$868.40 <br />$415.07 <br />$2,336.24 <br />Regrade Drill Pads an Mud Pits Holes TWC001- <br />007 <br />DOZER <br />5.05 <br />Replace Topsoil on Drill Pads for Holes TWC001- <br />007 <br />DOZER <br />2.41 <br />Reseed Exploration Pads TCW001 -007 <br />REVEGE <br />2.10 <br />SUBTOTALS: <br />65.56 <br />$ $25,774.33 <br />Task description: <br />Site: Foidel Creek Mine <br />Summary of MR256 Tasks <br />PROJECT IDENTIFICATION <br />Task #: 56A State: Colorado <br />Date: 8/31/2011 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Permit Action: MR25 Permit/Job #: C1982056 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 Total = $0.00 <br />Performance bond: 0.00 Total = $0.00 <br />Job superintendent: 32.78 Total = $1,919.60 <br />Profit: 10.00 Total = $2,577.43 <br />TOTAL 0 & P = $4,497.03 <br />CONTRACT AMOUNT (direct + O & P) = $30,271.36 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25 <br />5.00 <br />Abbreviation: None <br />Filename: CO56 -56a <br />Total = <br />Total = <br />CONTINGENCY: 0.00 Total = $0.00 <br />0.00 <br />$1,286.53 <br />$1,513.57 <br />TOTAL INDIRECT COST = $7,297.13 <br />TOTAL BOND AMOUNT (direct + indirect) = $33,071.46 <br />