Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 INTRODUCTION 4 <br />2.0 EXISTING CONDITIONS 5 <br />3.0 PROPOSED ACTIONS <br />UNDERGROUND EXPLORATION DEVELOPMENT ACTIVITIES 6 <br />3.1 NEWDECLINE 6 <br />3.2 PORTAL FACE -UP AND BENCH CONSTRUCTION 7 <br />3.3 DECLINE EXCAVATION 7 <br />3.4 VENTILATION /ESCAPE RAISE REHABILITATION 8 <br />3.5 UNDERGROUND EXPLORATION WORK 8 <br />4.0 EXPLORATION DEVELOPMENT ROCK HANDLING AND STORAGE 9 <br />5.0 GROUNDWATER HANDLING 12 <br />6.0 SURFACE FACILITIES 13 <br />6.1 PORTAL AREA FACILITIES 13 <br />6.2 PROJECT ADMINISTRATION AND SUPPORT FACILITIES 14 <br />7.0 WORK FORCE 16 <br />8.0 EQUIPMENT 17 <br />9.0 MATERIALS AND SUPPLIES 17 <br />10.0 RECLAMATION 19 <br />11.0 ENVIRONMENTAL MANAGEMENT AND MITIGATION 20 <br />11.1 AIR QUALITY 20 <br />11.2 CULTURAL AND HISTORIC RESOURCES 21 <br />11.3 EROSION AND SEDIMENT CONTROLMEASURES 21 <br />11.4 HEALTH AND SAFETY 21 <br />11.5 NOISE 22 <br />11.6 RECREATION 22 <br />11.7 ROAD CONSTRUCTION 22 <br />11.8 TRASH AND OTHERWASTEMATERIAL 22 <br />11.9 VISUAL RESOURCES AND LIGHTING 23 <br />11.10 SOILS 23 <br />11.11 VEGETATION 23 <br />11.12 WILDLIFE 24 <br />Page 12 <br />