Demo Worksheet Cont'd <br />Task # TTT <br />Page 2 of 7 <br />CIRCES Cost Estimating Software <br />6 "T <br />disposal in existing pit, 6 <br />in. thick - Max. 200 ft. <br />push <br />- concrete <br />foundation/footer <br />16 @2ft. dia. x <br />12 ft. L <br />Demo. and on -site <br />disposal in existing pit, <br />1.O ft. x 2ft. - Max. 50 <br />ft. push <br />192.00 <br />LF <br />$6.23 <br />$1,196.16 <br />Electrical <br />Instrumation bldg. <br />(EIB) - superstructure <br />+ gutting <br />401 x 20'W x <br />20'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />16,000.00 <br />CF <br />$1.27 <br />$20,368.00 <br />- concrete floor <br />40'L x 20'W x <br />6 "T <br />Demo. and on -site <br />disposal in existing pit, 6 <br />in. thick - Max. 200 ft. <br />push <br />800.00 <br />SF <br />$1.57 <br />$1,256.00 <br />- concrete <br />foundation/footer <br />16 @2 ft. dia. x <br />12 ft. L <br />Demo. and on -site <br />disposal in existing pit, <br />1.O ft. x 2ft. - Max. 50 <br />ft. push <br />192.00 <br />LF <br />$6.23 <br />$1,196.16 <br />- electrical conduit <br />between EIB & MCC <br />DCS rack <br />100' total length <br />USER PROVIDED <br />ITEM <br />100.00 <br />LF <br />$0.65 <br />$64.58 <br />MCC DCS rack unit - <br />superstructure <br />20'L x 10'W x <br />10'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />2,000.00 <br />CF <br />$1.27 <br />$2,546.00 <br />- concrete pad <br />20'L x 10'W x <br />12 "T <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />50 ft. push <br />200.00 <br />SF <br />$3.19 <br />$638.00 <br />- concrete foundation <br />footer <br />6@ 2 ft. dia. x <br />12 ft. L <br />Demo. and on -site <br />disposal in existing pit, <br />1.O ft. x 2ft. - Max. 50 <br />ft. push <br />72.00 <br />LF <br />$6.23 <br />$448.56 <br />Cable tray - EIB + <br />MCC DCS rack to <br />test pad - superstruct. <br />420'L x 6'W x <br />2'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />5,040.00 <br />CF <br />$1.27 <br />$6,415.92 <br />- concrete cable tray <br />foundation caissons <br />(20 ft. ctrs) <br />220 x 2 @2 ft. <br />dia. x 6'L <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.5 ft. x 2 ft. - Max. <br />50 ft. push <br />132.00 <br />LF <br />$9.57 <br />$1,263.24 <br />Air compressor unit - <br />superstructure <br />12'L x 5'W x <br />6'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />360.00 <br />CF <br />$1.27 <br />$458.28 <br />- piping - compressor <br />to N2 rack <br />total 36'L x4- <br />6 "dia. insulated <br />steel pipe <br />Pipe, steel, welded <br />connections - 10 in. <br />diameter pipe <br />36.00 <br />LF <br />$13.95 <br />$502.33 <br />N2 rack unit - - <br />superstructure <br />12'L x 5'W x <br />6'H <br />Plant (1S) demo. /on -site <br />disposal in excavated pit <br />- Max. 200 ft. push <br />360.00 <br />CF <br />$0.17 <br />$59.40 <br />- piping - N2 rack to <br />test pad <br />160'L x 4 -6" <br />dia. insulated <br />steel pipe <br />Pipe, steel, welded <br />connections - 10 in. <br />diameter pipe <br />160.00 <br />LF <br />$13.95 <br />$2,232.59 <br />Chemical rack unit - <br />superstructure and <br />gutting <br />20'L x 10'W x <br />10'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />2,000.00 <br />CF <br />$1.27 <br />$2,546.00 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 2 of 7 <br />CIRCES Cost Estimating Software <br />