Laserfiche WebLink
to pipe rack <br />insulated steel <br />pipe <br />connections - 10 in. <br />diameter pipe <br />Flare system piping - <br />pipe rack No. 2 to <br />flare stack <br />158'L x 4" dia. <br />insulated steel <br />pipe <br />Pipe, steel, welded <br />connections - 4 in. <br />diameter pipe <br />158.00 <br />LF <br />$6.97 <br />$1,100.72 <br />- piping "t" supports <br />above grade <br />8@ 3'W x .5'H <br />stl pipe <br />USER PROVIDED <br />ITEM <br />64.00 <br />LF <br />$7.60 <br />$486.40 <br />- piping "t" support <br />foundations <br />8 @2' dia. x 6'L <br />Demo. and on -site <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. 50 <br />ft. push <br />48.00 <br />LF <br />$18.68 <br />$896.64 <br />- flare stack <br />superstructure <br />4" dia. x 50' H <br />guy wires <br />USER PROVIDED <br />ITEM <br />1.00 <br />EA <br />$1,416.00 <br />$1,416.00 <br />- flare stack guy wire <br />foundations <br />4 @2' dia. x 6'L <br />Demo. and on -site <br />disposal in existing pit, <br />1.5 ft. x 2 ft. - Max. 50 <br />ft. push <br />24.00 <br />. <br />LF <br />$9.34 <br />$224.16 <br />Tank battery - verticle <br />tanks - tank bodies <br />10 stl. tanks @ <br />12'x20' <br />USER PROVIDED <br />ITEM <br />10.00 <br />EA <br />$4,642.75 <br />$46,427.50 <br />- stairs /catwalk <br />2 @25'L x 3'W <br />x 5'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />750.00 <br />CF <br />$1.27 <br />$954.75 <br />- concrete <br />containment pad <br />115'L x 58'W x <br />12 "T <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />6,670.00 <br />SF <br />$3.22 <br />$21,477.40 <br />- concrete <br />containment curb wall <br />346'P x 8 "T x <br />3'1-1 <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />1,038.00 <br />SF <br />$2.36 <br />$2,449.68 <br />- concrete <br />containment footer <br />346'P x 2'T x <br />3'H <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />346.00 <br />LF <br />$19.30 <br />$6,677.80 <br />- tank surface <br />inlet/outlet piping to <br />pipe rack #2 <br />240'L x 4 -6 "dia <br />ins. stl. <br />Pipe, steel, welded <br />connections - 10 in. <br />diameter pipe <br />240.00 <br />LF <br />$13.95 <br />$3,348.89 <br />- tank vent & <br />associated piping <br />31'L x 4 -6 "dia. <br />insulated steel <br />pipe <br />Pipe, steel, welded <br />connections - 10 in. <br />diameter pipe <br />31.00 <br />LF <br />$13.95 <br />$432.56 <br />Cooler bldg. No. 2 - <br />superstructure & <br />gutting <br />25'L x 20'W x <br />25'H <br />Plant (1S) demo. /off -site <br />disposal in approved <br />landfill - Max. 60 mile <br />haul <br />12,500.00 <br />CF <br />$1.27 <br />$15,912.50 <br />- concrete floor <br />25'L x 20'W x <br />8 "T <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />500.00 <br />SF <br />$2.14 <br />$1,070.00 <br />- concrete foundation <br />wall <br />90'P x 8 "T x <br />2'H <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />180.00 <br />SF <br />$2.36 <br />$424.80 <br />- concrete footer, strip <br />type <br />90'P x 2'T x 3'H <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />90.00 <br />LF <br />$19.30 <br />$1,737.00 <br />- piping - cooler bldg. <br />to pipe rack <br />60'L x 4 -6" dia. <br />insulated steel <br />Pipe, steel, welded <br />connections - 10 in. <br />60.00 <br />LF <br />$13.95 <br />$837.22 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 5 of 7 <br />CIRCES Cost Estimating Software <br />