My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-31_PERMIT FILE - X201023200
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X201023200
>
2011-08-31_PERMIT FILE - X201023200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:48 PM
Creation date
9/1/2011 8:47:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201023200
IBM Index Class Name
PERMIT FILE
Doc Date
8/31/2011
Doc Name
Final 180 Day Report
From
AGAPITO Associates, Inc
To
DRMS
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
see attached. <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 - 3567 <br />COAL EXPLORATION 180 -DAY REPORT <br />1. Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />Ng; 3 x.011 <br />c ;ecâ–ºama ! °°' <br />and Sates <br />Prospector: NewElk Coal Company Notice of Intent No.: X- 2010 - 232 -00 <br />Address: 122 W. First Street Project Name: 2010 Exploration Program <br />Trinidad, CO 81082 County: Los Animas <br />Date: 8/29/2011 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. The purpose of this report is to update <br />the Division on exploration and reclamation activities that have occurred in the past 180 days <br />of active prospecting. The report also indicates any changes in operations from what was <br />stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br />modify this form, or use a different format altogether. <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 <br />days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br />activities. (Attach additional pages, if needed.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.