My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-06-01_GENERAL DOCUMENTS - M1985029
>
Day Forward
>
General Documents
>
Minerals
>
M1985029
>
2004-06-01_GENERAL DOCUMENTS - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:15:54 PM
Creation date
8/31/2011 7:10:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/1/2004
Doc Name
Cost Est.- FAX
From
DMG
To
Greg Lewicki & Associates- Ben
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/21/2004 <br />User : AJW <br />Agency or organization name :DMG <br />Permit or other job action :AM-02 <br />Task description :re-grade spoils <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 78,000 LCY <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 515.8 LCY/hr <br />Material consistency description : <br />Loose stockpile <br />Average push gradient : 10.00 % (pos) <br />Average site altitude : 10,350 feet <br />Material weight : <br />Weight description : <br />Gravel - Dr)/ (1/4"-2"diam.) <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Park <br />Site :Alma Placer <br />Basic machine : Cat D8R Series II- 8U <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Source of estimated volume :AM-02 rec cost est <br />2,850 lbs/LCY <br />Dozer(s) <br />$0.964 /LCY <br />Swell <br />factor : <br />$50.09 <br />$50.04 <br />$1.05 <br />$31.83 <br />$133.02 <br />NA <br />Permit/jo <br />Abbreviati <br />Filename <br />Utilization % <br />NA <br />75 <br />15 <br />NA <br />Loose <br />volume : <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Total job time : <br />- Total job cost : <br />:none <br />Total fleet cost/hour : $133.02 <br />Horsepower : 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />78,000 LCY <br />Source <br />0.75 (avg.) <br />1.20 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shift/day) <br />0.60 (fnd-s17 <br />0.79 (Cat HB) <br />0.94 (Cat HB) <br />0.81 (Cat HB) <br />1.00 (S/SU/U) <br />0.27 <br />Adjusted unit production : 137.93 LCY/hr <br />Adjusted fleet production : 137.93 LCY/hr <br />565.51 Hours <br />$75,224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.