My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-29_REVISION - M1986002 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2011-08-29_REVISION - M1986002 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:16 PM
Creation date
8/30/2011 8:59:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
REVISION
Doc Date
8/29/2011
Doc Name
Amendment to CN-01
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
CN1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />July 25, 2011 <br />Greg Lewicki And Associates <br />Travis Marshal <br />Division of Reclamation. Mining and Safety <br />101 South 3rd Suite 301 <br />Grand Junction, CO 815.01 <br />(970)- 241 -2042 <br />11541 Warrington Court Phone (303) 346 -5196 Fax: (303) -346 -6934 <br />Parker, CO USA 80138 L- 111ail;info(a)c�vicki.bi� <br />RE: Craig Ranch Pit - Adequacy Review Response, Permit # M- 1986 - 002 /CN -01 <br />Travis, <br />Attached with this letter is the revised C -2 Map. <br />1. The access road shown on Map C -2 is the only access road proposed for the mining <br />operation. This road is completely on United Companies property and is located within <br />the permit area. This road connects directly to HWY 141. <br />2. The topsoil to be stored within Mining Area 1 will come from undisturbed areas within <br />Mining Areas 1,2 and 3. All other topsoil will be directly placed in areas ready for <br />reclamation. The amount of land that is currently undisturbed within Mining Areas 1, 2 <br />and 3 is 30 acres. This is less than the total acreage since previous, operators did not <br />salvage topsoil. The approximate volume of topsoil is 30 acres x 0 -5 inches of topsoil <br />(2.5 inch expected average) = 10,000 CY. <br />3. The water that is going to be used on site will be transported by a 6" hdpe pipe. This pipe <br />will lay on the ground surface. The pipe will cross HWY 141 through a 12" culvert that <br />will be installed as part of the access road connection with HWY 141. There will be a <br />pump at the McCurter's Lake 2b. The pipe will follow the southern side of the access <br />road to reach the facilities area. <br />4. The waste fines stockpile is shown on Map C -2. The location is west of the wash ponds <br />in the facility area. <br />5. The depth of topsoil placed on the islands will be approximately 3 -6 inches and will be <br />place over 3 -6 inches of waste fines. This will give a total of 6 -12 inches of plant growth <br />medium. The site have very limited topsoil quality and quantity. All topsoil encountered <br />will be salvaged during mining and will be replaced at the above estimated thicknesses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.