Laserfiche WebLink
• <br />• <br />Transit Mix <br />May 18, 2011 <br />Page 5 of 5 <br />LIMITATIONS <br />The stratification lines designating the interface between soil types on the test boring reports represent <br />approximate boundaries. The transition between materials may be gradual. <br />The test boring reports and related information depict subsurface conditions only at the specific locations and at <br />the particular time designated on the reports. Soil conditions at other locations may differ from conditions <br />occurring at these boring locations. Also, the passage of time may result in a change in the subsurface conditions <br />at these boring locations. <br />This report has been prepared for Transit Mix for specific application to the Pueblo East, Phase 7 projects as <br />understood at this time, in accordance with generally- accepted geotechnical engineering practices common to the <br />local area. No other warranty, express or implied, is made. In the event that changes in the nature, design, or <br />location of the planned construction are made, the conclusions and recommendations contained in this report <br />should not be considered valid, unless the changes are reviewed by Lyman Henn and the conclusions of this <br />report are modified or verified in writing. <br />Nothing contained in this report shall be construed to create, impose, or give rise to any duty owed by Lyman <br />Henn to any individual or entity other than Transit Mix. This report is for the sole use and benefit of Transit Mix <br />and may not be used or relied upon by any other individual or entity without the express written approval of <br />Lyman Henn. <br />The analyses and recommendations are based, in part, upon the data obtained from the referenced subsurface <br />explorations. The nature and extent of variations between explorations may not become evident until <br />construction. If variations appear, it may be necessary to re- evaluate the recommendations of this report. <br />The scope of Lyman Henn's services does not include a full environmental assessment and does not provide an <br />analysis for the presence or absence of hazardous or toxic materials in the soil, groundwater, or surface water <br />within or beyond the site studied. Any statements in this report or on the test boring reports regarding odors of <br />soil or other unusual conditions observed are strictly for the information of our client. Unless complete <br />environmental information regarding the site is already available, an environmental assessment is recommended <br />prior to construction. <br />CLOSING <br />We appreciate the opportunity to provide [environmental consulting/engineering] services on this project. Please <br />do not hesitate to call if you have any questions or comments. <br />Sincerely, <br />LYMAN HENN, a division of Brierley Associates, LLC <br />Rebecca <br />Project <br />,J� L <br />Nathan C. Soule, P.E., P.G. <br />Senior Engineer <br />