My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-29_REVISION - M1986015 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2011-08-29_REVISION - M1986015 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:20 PM
Creation date
8/30/2011 7:22:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
8/29/2011
Doc Name
Amendment Submittal
From
Continental Materials Corporation
To
DRMS
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S Exhibit L <br />TABLE L -3 <br />• <br />• <br />A Structure Removal <br />1 Remove field conveyor <br />2 Remove screen plant & stacker <br />Remove sump pump & pipe <br />Remove discharge pipe from settling <br />basin <br />B Material Backfilling <br />1 Backfill with reject sand east of <br />mining face, scraper, 480'X60'X13' <br />Backfill with OB from stockpiles to Year 2 area, <br />2 scraper <br />Backfill with OB from stockpiles to item B1 area, <br />3 scraper <br />Pump slurry into dewater trench (1950 ft length) <br />4 around Year 3, scraper with dozer push <br />Push levee & bench under levee into the dewater <br />trench & beyond in the Year 3 area (865' length) <br />Push levee & bench under levee into the dewater <br />5 trench in Year 2 & 1 area (1400' length) <br />Pump slurry into dewater trench (1400 ' length) in <br />the year 2 & 1 area <br />Push in bench on north setback of Year 2 area, <br />6 dozer <br />7 Pump slurry into settling basin <br />8 Backfill and grade TS on Year 2 area, scraper <br />9 Backfill and grade TS on item B1 area, scraper <br />10 Backfill and grade TS on levee area, scraper <br />11 Backfill and grade TS on runoff channels, scraper <br />Reclamation Costs <br />Construction <br />Excavate 2 runoff channels to River, push material <br />into backfll, dozer <br />C Revegetation <br />1 Scarify conveyor and road <br />2 Scarify stockpile areas <br />Seed & mulch Year 1 area <br />Seed & mulch Year 2 area <br />Seed & mulch Year 3 area <br />Seed & mulch stockpile area <br />Seed & mulch north setback area <br />Seed & mulch drainage channel area <br />Seed & mulch levee area <br />Seed & mulch runoff channel area <br />Estimated <br />ITEM QTY UNITS UNIT COST COST <br />1100 ft <br />1 ea <br />1 ea <br />1 ea <br />$4.00 $4,400.00 <br />$500.00 $500.00 <br />$500.00 $500.00 <br />$500.00 $500.00 <br />14000 cy $1.09 $15,260.00 <br />77500 cy $1.09 $84,475.00 <br />12700 cy $1.09 $13,843.00 <br />18100 cy $1.65 $29,865.00 <br />12700 cy $0.49 $6,223.00 <br />20584 cy $0.49 $10,086.16 <br />16749 cy $1.66 $27,803.34 <br />23750 cy $0.49 $11,637.50 <br />42000 cy $1.66 $69,720.00 <br />16135 cy $1.09 $17,587.15 <br />650 cy $1.09 $708.50 <br />1703 cy $1.09 $1,856.27 <br />555 cy $1.09 $604.95 <br />6000 cy $0.49 $2,940.00 <br />2.5 ac $63.00 $157.50 <br />3 ac $63.00 $189.00 <br />20 ac $180.00 $3,600.00 <br />20 ac $180.00 $3,600.00 <br />8 ac $180.00 $1,440.00 <br />3.02 ac $180.00 $543.60 <br />3.64 ac $180.00 $655.20 <br />10.1 ac $180.00 $1,818.00 <br />2.35 ac $180.00 $423.00 <br />0.74 ac $180.00 $133.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.