Laserfiche WebLink
• <br />Hydrograph <br />type <br />(origin) <br />Inflow <br />Peak Outflow (cfs) <br />Hydrograph <br />description <br />Hyd(s) <br />1-Yr <br />2-Yr <br />3-Yr <br />5-Yr <br />10-Yr <br />25-Yr <br />50-Yr <br />100-Yr <br />1 <br />Rational <br />----- <br />----- <br />----- <br />149.33 <br />----- <br />----- <br />229.99 <br />South of Highway <br />2 <br />SCS Runoff <br />----- <br />----- <br />------ <br />----- <br />----- <br />589.46 <br />---- <br />----- <br />1377.43 <br />North of Highway <br />3 <br />Reach <br />2 <br />------ <br />------ <br />------ <br />587.40 <br />----- <br />----- <br />1374.33 <br />Proposed Channel <br />4 <br />Combine <br />1, 3 <br />------ <br />----- <br />587.40 <br />------ <br />------ <br />1374.33 <br />South into Channel <br />• <br />III <br />Proj. file: 2011060_hydraflow.gpw <br />Wednesday, Jun 15 2011, 4:57 PM <br />( <br />Hydrograph Return Period Recap <br />Hydraflow Hydroaraphs by Intelisolye <br />