Laserfiche WebLink
Permittee Name: ann Resources, LLC <br />Permit No.: jM- 1986 -079 <br />Operation Name: M &G Pit <br />Anniversary Date: August 3, 2011 <br />Total: $791.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 78.78 Current Bond $ <br />b. County where mine is located: Adams <br />2. Has your mine been granted a•TEMPORARY CESSATION STATUS? YES <br />Does your mine operate MORE or LESS than 180 days per year MORE <br />3. Does this mine have a phased reclamation plan? YES <br />4. Total acres affected during the report year:* 0 <br />5. Total acres reclaimed for the report year:* 0 <br />6. Total number of acres in topsoil replacement stage:* 0 <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />Signature: <br />for the location of the areas disturbed in the past. <br />Please type or <br />Contact Name: <br />Company: <br />Address: <br />Notice of Intent to Continue Mining Operations <br />112 Construction Materials Annual Report <br />"If /eAre <br />print curre <br />Clay Carl <br />Mann Resources, LLC <br />P.O. Box 247 <br />Eastlake, CO 80614 <br />Date: <br />oa <br />OVER <br />L <br />ontact name, address and phone number below: <br />Phone: 303 - 280 - 7928 <br />Fax NO: <br />o/C <br />RECEIVED <br />AUG 2 9 2011 <br />ac. <br />ac. <br />ac <br />in <br />29.00 ac. <br />8. For non - phased operations provide the dates extraction ceased: NA <br />a. Date reclamation began: 2008 <br />9. The type and approximate quantity of fertilizers, organic materials or <br />soil conditioners used for the report year:* NA <br />10. Estimated total acres to be affected in the next report year:* 0.0 <br />11. COMMENTS Mann Resources assumed this permit in March 2011. <br />The site was reclaimed by the previous operator & no additional <br />Division of Reclamation, <br />4,0 Mining & Safety <br />work was done this year. Please refer to the 2010 annual report <br />* Please show the location of the acreage for items 4 - 6 on your map * *. <br />Indicate the phases of the reclamation which have been completed, correlated <br />with your timetable. For phased operations show dates extraction ceases and <br />dates reclamation began. <br />** NOTE: If there have been any changes since the last annual report and <br />you previously submitted a map which correctly depicts the current acreage <br />in items 2 throug then a new map is unnecessary. However, this must be <br />stated above. <br />