My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_PERMIT FILE - P2011028 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011028
>
2011-08-26_PERMIT FILE - P2011028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:41 PM
Creation date
8/26/2011 11:33:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011028
IBM Index Class Name
PERMIT FILE
Doc Date
8/26/2011
Doc Name
New NOI- Prospecting
From
Terry Winters
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 (FORM 2 - Public filing) <br />G. Total project area to be disturbed 1 3 • 9 5 (acres) <br />K. Describe the equipment to be used for the prospecting operations: <br />Metal Detectors ( Gold Master II) and pick and shovel. <br />Lab size trommel Run 5 gal. bucks in 4 hour, which it size <br />and screen. No water run dry. <br />Spiral concentrator ( run concenteator from ( trommel). Run time <br />4 hour . Purchased water for spiral concentrator. 40 gal. water. <br />This Equiment is used to fine, size and screen material. <br />L. Describe, and locate any structures to be constructed (i.e. stockpiles, ponds, impoundments): <br />(NO) New Structures. There cape two Historic mining cabionsand a. <br />mining garage. Assessment work made on Historic mining cabion <br />to keep up with county building code. Photo of Historic mining <br />cabion and garage. (NO) stockpiles, ponds, impoundments <br />M. Describe anticipated relationship to surface water and groundwater (proximity to streams, penetration of ground <br />water aquifers): <br />surface water or ground water 44sn4hde,4, <br />Prospecting will be 1,000 ft. from creek. prny, No, 14 <br />IV. OPERATION AND RECLAMATION MEASURES: <br />1. The Board suggests that a photographic record of the pre - prospecting and post - prospecting conditions be kept by the <br />prospector. These photos should be taken from the same location and by the same method to clearly show the pre- prospecting <br />condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond or surety release, the <br />Board may consider the photos as evidence of adequate reclamation, and thus, be able to act more quickly on the request for <br />release. <br />2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub, and grass communities of the <br />area. Color photographs, sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br />orientation and location), may be used in lieu of a written description. Based on the quality of the photographs, the Division <br />may require additional detail. <br />Mostly logepole pine trees and rock Photo of the prospecting Area. <br />There little to no under grouth, an airrial map is given with app. <br />Photo is takeinq of the location of pre - prospectina and post- <br />,' <br />prospecting conditions be keep by the prospecting. Se_ e_ ' ora //A ¢ / /6 <br />16 Alt R.'»J reap Atli <br />
The URL can be used to link to this page
Your browser does not support the video tag.