Laserfiche WebLink
Regrade <br />2000 <br />Topsoil Replacement <br />2000 <br />Depth (inches): 17.3 <br />How Measured: load count <br />Topsoil Origin: Stockpile <br />(12% from Livehaul; 88% <br />■ Livehaul ❑ <br />from Stockpile) <br />Seedbed Preparation <br />2000 <br />Dragging -1 Disking ❑ Other ❑ (explain) <br />Fertilization <br />2000 <br />Product Used: 11 -54-0 <br />Rate: 87 lb/ac on replaced topsoil <br />Fertilized in September <br />Seed Mixture(s) <br />2000/2001 <br />Refer to Table(s) 97 -02AB <br />88.6 acres seeded in October 2000 <br />26.2 acres seeded in May 2001 <br />Bond Release <br />Phase I <br />Phase II <br />Phase Ill <br />Application # <br />SL -5 <br />SL -6 <br />SL -13 <br />Approval Date <br />6 -11 -04 <br />9 -6 -05 <br />Comments: 4,903 linear feet of new drainage reconstruction was accomplished in Oak <br />Drainage. <br />Contains Shrub Clump SC -A -01 <br />2004: 10 Acres sprayed with Roundup and interseeded with T04 -AB00 Interseed Mix. <br />2008: landslide disturbed 3.1 ac. <br />2011: 2.1 acres of drainages were removed from Phase Ill bond release. <br />• <br />• <br />• <br />M:IRECLMHS <br />Parcel Designation: A -B -00 <br />Reclamation <br />Activity <br />TRAPPER MINE <br />RECLAIMED PARCEL HISTORY <br />Year(s) of <br />Occurrence <br />Acreage: 109.6 <br />Comments <br />