Truck/loader team -Truck :Cat <br />- Loader :CAT <br />773D (2002) <br />5090E <br />Support equipment -Load area :NA <br />-Dump area :Cat <br />D6R - 6S (2003) <br />Road maintenance -Motor grader : <br />-Water truck : Water <br />CAT 14H <br />Tanker, 3,500 Gal. <br />Cost Breakdown : <br />ruck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance <br />Motor Grader <br />Equipment <br />Water Truck <br />Import data filename • <br />truck2 <br />shovel <br />NA <br />dozer <br />grader <br />misctruk <br />% Utilization- machine : <br />100 <br />96 <br />NA <br />100 <br />50 <br />50 <br />- Ripper attachment • <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />363.47 <br />385.96 <br />NA <br />$24.86 <br />341.68 <br />$11.98 <br />Operating cost/hour : <br />394.98 <br />3151.96 <br />NA <br />340.27 <br />$24.30 <br />312.16 <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />30.00 <br />30.00 <br />NA <br />Operator cost/hour : <br />$25.88 <br />$38.72 <br />NA <br />338.54 <br />$38.91 <br />338.70 <br />Unit subtotals : <br />Number of units : <br />3184.33 <br />3276.64 <br />NA <br />3103.66 <br />3104.89 <br />362.83 <br />2 <br />1 <br />0 <br />1 <br />1 <br />1 <br />Group subtotals : <br />Work : 3645.30 <br />Support : 3103.66 <br />Maintenance : 3167.72 <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: <br />Date : <br />User : <br />005 <br />10/22/2009 <br />MAC <br />Permit or other job action :Bond Estimate <br />MATERIAL QUANTITIES <br />Initial <br />volume : 10,882 LCY <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) : 7.500 LCY <br />Descr. : Bank Clay,; Earth (100% -105 %) <br />Bucket fill factor : 1.025 <br />Adjusted bucket capacity : 7.687 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />State : Colorado <br />County : Weld <br />Site :Kurtz Resource Recovery <br />Task description :Replacing Topsoil Tract A <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />♦Equipment Descr <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : <br />Material weight : 1,600 pounds/LCY <br />Descr. : Top Soil <br />Rated payload : 108,060 pounds • <br />Payload capacity : 67.54 LCY <br />LCY <br />Swell <br />factor : NA <br />Total work team cost/hour : $916.68 <br />Source of quantity take -off :Revised Reclamation Estimate (Spreadsheet) <br />Source of estimated swell factor :NA <br />Material purchase cost : $0.00 /LCY <br />Final truck volume based on number of loader passes : <br />• truck volume adjusted to not exceed rated payload or heaped volume <br />Altitude adj. : <br />Job efficiency : <br />Net correction : <br />Truck <br />1.000 <br />0.830 <br />0.830 <br />Loader <br />1.000 <br />0.830 <br />0.830 <br />Job Condition Corrections : <br />Truck Bed (volume) Basis : <br />Struck volume : <br />Heaped volume : <br />Average volume : <br />Adjusted volume *: <br />Permit/job # :M- 1999 -006 <br />Abbreviation :none <br />Filename :M006 -005 <br />Total cost : <br />Loose <br />volume : 10,882 LCY <br />ffir <br />$0 <br />33.80 <br />45.90 <br />39.85 <br />45.90 <br />38.44 <br />sheet t of 2 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Site altitude (ft.) : 4,800 <br />Source <br />(Cat HB) <br />1 shift/day) <br />