My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-23_REVISION - M1999006 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999006
>
2011-08-23_REVISION - M1999006 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:52 PM
Creation date
8/25/2011 1:25:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999006
IBM Index Class Name
REVISION
Doc Date
8/23/2011
Doc Name
FW Calculation
From
DRMS
To
Varra Companies, Inc.
Type & Sequence
TR3
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User : <br />Agency or organization name :DRMS <br />Permit or other job action : Bond Estimate <br />Task description : Grading Pit Walls A <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Initial <br />volume : 61,034 <br />- HOURLY PRODUCTION <br />Material consistency description : <br />Compacted fill or embankment <br />003 <br />10/2212009 <br />MAC <br />Cost Breakdown : <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost: <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County : Weld <br />Site :KUlt Resource Recovery <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Ownership cost/hour : <br />Operating cost/hour: <br />Ripper op. cost/hour: <br />Operator cost/hour: <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,222.9 LCY/hr <br />Average push gradient : 30.00 % (pos) <br />Average site altitude : 4,800 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />:Cat D9R - 9U (2005) <br />:Universal <br />:ROPS Cab <br />:NA <br />Total unit cost/hour : $198.29 <br />2 Dozer(s) <br />Swell <br />factor : <br />NA <br />Permit/job# :M-1999-006 <br />Abbreviation :none <br />Filename :M006-003 <br />Utilization % <br />$58.16 NA <br />$101.59 100 <br />$0.00 NA <br />$38.54 NA <br />Source of estimated volume :Revised Reclamation Cost Estimate(Spreadsheet) <br />Source of estimated swell factor :NA <br />. . . <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Loose <br />volume : 61,034 LCY <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.30 <br />1.00 <br />0.79 <br />1.00 <br />0.11 <br />Adjusted unit production : 235.45 <br />Adjusted fleet production : <br />INNL, <br />Total job time : <br />Total job cost : <br />Horsepower : 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $396.57 <br />470.90 <br />$0.842 /LCY <br />129.61 <br />$51,401 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1shift/day) <br />(fnd-d) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />LCY/hr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.