Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />Dewatering Wash Plant Supply Pond <br />PUMPING <br />.--- - N .-I ,-. ,-. .-. ■-. ,-. - .-. <br />48.90 <br />$2,151.00 <br />$34,517.00 <br />$51,401.00 <br />$25,823.39 <br />$15,770.00 <br />$18,910.00 <br />$10,601.00 <br />$15,460.00 <br />$20,528.00 <br />$10,803.00 <br />$2,548.83 <br />Dewatering Basin A <br />PUMPING <br />4,916.99 <br />Grading Pit Walls Tract A <br />DOZER <br />129.61 <br />Seeding the disturbed areas <br />REVEGE <br />24.00 <br />Replacing Topsoil Tract A <br />TRUCK1 <br />17.20 <br />Replacing Topsoil Tract B <br />TRUCK1 <br />20.63 <br />Replacing Topsoil Tract D <br />TRUCK1 <br />11.65 <br />Equipment Mobilization/Demobilization <br />MOBILIZE <br />13.20 <br />Replacement Pump <br />PUMPING <br />0.10 <br />Dewatering Tract C <br />PUMPING <br />431.43 <br />Replacing Topsoil Tract C <br />TRUCK1 <br />2.82 <br />SUBTOTALS: <br />5616.53 <br />$ $208,513.22 <br />Task description: Cost Summary <br />Kurtz Resource Recovery & Permit Action: Financial my <br />Calculation Permit /Job #: M1999006 <br />Site: Land Devlpmnt Proj <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/23/2011 County: Weld <br />User: MAC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Abbreviation: None <br />Filename: M006 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $4,211.97 <br />Performance bond: 1.05 Total = $2,189.39 <br />Job superintendent: 883.00 Total = $51,708.48 <br />Profit: 10.00 Total = $20,851.32 <br />TOTAL 0 & P = $78,961.16 <br />CONTRACT AMOUNT (direct + 0 & P) = $287,474.38 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 <br />Reclamation management and /or administration: 5.00 <br />Total = <br />Total = <br />0.00 <br />$12,217.66 <br />$14,373.72 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $105,552.54 <br />TOTAL BOND AMOUNT (direct + indirect) = $314,065.76 <br />