Laserfiche WebLink
Snowcap Coal Company, Inc. <br />- 2 - 2010 Annual Reclamation Report <br />Conveyor Corridor from Xcel Culvert north to Haul Road #3 (No. 26 Below) 2.7 <br />(Ph 111 release on 0.5 acres in 2009) <br />Conveyor Corridor from Xcel Culvert south to Transfer Bldg #2 and east of 1.6 <br />Colorado River (No. 27 Below) (Ph 111 release on 1.3 acres in 2009) <br />Substation A (No. 28 Below) 0.2 <br />Roadside South Portal Mine Facilities and Stockpile /Prep Plant Area 13.5 <br />and Conveyor Tunnel Under 1 -70 (No. 29 Below) (Ph 111 release <br />on 13.5 acres in 2010) <br />Roadside South Portal Road to Old Upper Diversion Ditch (No. 30 Below) 1.9 <br />and Conveyor Tunnel Under 1 -70 (No. 29 Below) <br />Railroad Loop Track - South of 1 9/10 Road (No. 31 Below) 0.3 <br />(Ph 111 release on 0.3 acres in 2009) <br />Cameo Refuse Disposal Area No. 1 (No. 32 Below) 1.2 <br />Unit Train Load -out and Railroad Loop Track/Conveyor Corridor 38.1 <br />(No. 33 Below) <br />Total 191.5 <br />Areas Permanently disturbed are as follows: <br />Description <br />Access Road to No. 2 West Portals (No. 21 Below) <br />Haul Roads to CRDA 1, 2 and 3 <br />Access Road #2 (Through North Decline) <br />Haul Road #3 at UTL <br />Total <br />Acres Disturbed by Mining Activities <br />Less Previously Reclaimed Areas <br />Less Permanently Disturbed Areas <br />Equals Remaining Reclamation Acres <br />3.8 <br />3.4 <br />0.4 <br />0.9 <br />8.5 <br />241.7 <br />191.5 <br />8.5 <br />41.7 <br />(c) Area back filled and graded - 39.6 acres during 2010 (38.1 at UTL, 1.2 at CRDA <br />#1 & 0.3 at TS Pile #1). 10.9 acres achieved Phase 111 Bond release in 2010. <br />(d) Area Top - soiled - 2.1 acres during 2010 (0.9 at UTL and 1.2 at CRDA #1). 7.7 <br />acres achieved Phase 111 Bond release in 2010. <br />(e) Area Seeded - 2.1 acres during 2010. Ponds 1 & 2, topsoil pile #4 and coal fine <br />cleanup area at UTL - 0.9 acres - was seeded during 2010 with seed mix shown <br />on Table 14 -8, Lowland Components (seed mix tag attached). 1.2 acres at <br />CRDA #1 was seeded in September 2010 with seed mix shown on Table 14 -8, <br />Upland Components (seed mix tag attached). 8.6 acres achieved Phase 111 <br />Bond release in 2010. <br />One (1) acre that had been redisturbed on top of CRDA #1 was re- seeded in <br />September 2010 with seed mix shown on Table 14 -8, Upland Components. <br />Revised 08/11 <br />