Laserfiche WebLink
MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />August 19, 2011 <br />Mr. Mike Boulay <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Rom 215 <br />Denver, CO 80203 <br />Re: Snowcap Coal Company, Inc. <br />Revised 2009 & 2010 Annual Reclamation Reports <br />Roadside Mine C -81 -041 <br />Dear Mr. Boulay: <br />On behalf of Snowcap Coal Company, Inc. we are submitting the revised DRMS forms <br />entitled "Annual Reclamation Report for the Year 2009" and "Annual Reclamation <br />Report for the Year 2010 ". Also enclosed are revised pages 1 and 2 of Snowcap's <br />2010 Annual Reclamation Report. <br />During 2009 and 2010, Snowcap Coal Company achieved Phase III bond release on <br />2.1 and 14.8 acres, respectively. When we initially submitted the 2009 and 2010 <br />Annual Reclamation Reports we excluded the released acres from the Cumulative <br />Totals. In response to the telephone conversation we had this week, and as per your <br />request, the reports have been revised to include all previously disturbed, backfilled and <br />graded, topsoiled and seeded acres (inclusive of acres where Phase III release has <br />been achieved). Hopefully we are on the same page now with these report. <br />Please call if you have any questions or if any other revisions are required. <br />Sincerely, <br />V 44et,t n <br />Tonya'fC. Hammond <br />Owner's Representative <br />Snowcap Coal Company, Inc. <br />Enclosures <br />cc: DRMS Grand Junction <br />SCC File <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 ST., UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />