Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 11, 2011 <br />Paul Sizemore <br />Mesa County Planning Division <br />P.O. Box 20,000 <br />Grand Junction, CO 81502 -5022 <br />Re: Fruita Loadout <br />Major Site Plan Review <br />Dear Mr. Sizemore: <br />STATE OF COLORADO <br />COLORADO <br />D[ V 1 5[ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division of Reclamation, Mining and Safety (DRMS) has reviewed CAM Colorado, LLC's <br />(CAM's) Major Site Plan Application for the Fruita Loadout project recently submitted to your <br />office. DRMS has the following comments on the Major Site Plan due to recent changes made <br />by CAM to their plans and specifications for the proposed project. <br />1. CAM informed DRMS on August 3'd that they are removing the construction material <br />borrow area, borrow area topsoil stockpile, and Pond 4 from the overall plan. This <br />would affect Map 1 and Figure B in the application submitted to you. <br />2. CAM is also planning to change the design of the bridge over Reed Wash. The change <br />to the design is to avoid driving piling into the immediate stream bottom. This would <br />affect the rail spur and loop profile cross - section shown on Map 03 of the application. <br />Thank you for the opportunity to comment. If I may be of further assistance please contact me at <br />(970) 243 -1571 or mike. boulqy@,state. co.us. <br />Sincerely, <br />m ` i7' 30 <br />Michael P. Boulay <br />Environmental Protection Specialist <br />C: Taznme Bishop /J.E. Stover & Associates <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />