My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-29_PERMIT FILE - C1981019A (22)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2011-06-29_PERMIT FILE - C1981019A (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:59 PM
Creation date
8/23/2011 1:28:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/29/2011
Doc Name
Permanent Channel Design
Section_Exhibit Name
Exhibit 07 Item 20 Part E -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />SEDCAD 4 for Windows <br />+ooa _omn o—i. i <br />Trapezoidal Riprap Channel Inputs: <br />Material: Riprap <br />Bottom Left Right <br />Freeboard Freeboard Freeboard <br />Width ft Sideslope Sideslope Slope ( %) <br />() <br />Mult. x <br />Depth ( ft) % of Depth <br />Ratio Ratio <br />(VxD) <br />12.00 3.0:1 3.0:1 2.0 <br />16.43 ft <br />Riprap Channel Results: <br />Structure #15 (Pond) <br />Stk Pnd 6 <br />Pond Inputs: <br />Pond Results: <br />Simons /OSM Method - Steep Slope Design <br />Velocity and Manning's n calculations may not apply for this method. <br />Initial Pool Elev: 100.00 ft <br />Initial Pool: 2.01 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 101.47 ft <br />Dewater Time: 0.83 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />13 <br />Elevation - Capacity- Discharge Table <br />Filename: W Tay East Trib Ditch 10024.so4 Printed 12 -27 -2010 <br />Exh. 7- 20E -36 Revision Date: 12/31/10 <br />Revision No.: TR -81 <br />w/o Freeboard w/ Freeboard <br />Design Discharge: <br />92.12 cfs <br />Depth: <br />0.74 ft <br />Top Width: <br />16.43 ft <br />Velocity*: <br />X- Section Area: <br />10.51 sq ft <br />Hydraulic Radius: <br />0.630 ft <br />Froude Number *: <br />Manning's n *: <br />Dmin: <br />3.00 in <br />D50: <br />9.00 in <br />Dmax: <br />11.25 in <br />Velocity and Manning's n calculations may not apply for this method. <br />Initial Pool Elev: 100.00 ft <br />Initial Pool: 2.01 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 101.47 ft <br />Dewater Time: 0.83 days <br />Dewatering time is calculated from peak stage to lowest spillway <br />13 <br />Elevation - Capacity- Discharge Table <br />Filename: W Tay East Trib Ditch 10024.so4 Printed 12 -27 -2010 <br />Exh. 7- 20E -36 Revision Date: 12/31/10 <br />Revision No.: TR -81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.