Laserfiche WebLink
SEDCAD 4 for Windows <br />Trapezoidal Vegetated Channel Inputs: <br />Material: Smooth brome <br />Bottom Left Right Retardance <br />Freeboard Freeboard Freeboard <br />Limiting <br />Velocity <br />Sideslope Sideslope Slope ( %) Classes <br />Width (ft) <br />Depth (ft) % of Depth Mult. x (VxD) <br />(fps) <br />Ratio Ratio <br />20.00% <br />26.09 cfs <br />12.00 3.0:1 3.0:1 2.0 D, B <br />1.00 <br />7.0 <br />Vegetated Channel Results: <br />Structure #4 (Pond) <br />Sump <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: <br />Stability <br />Class D w/o <br />Freeboard <br />Stability <br />Class D w/ <br />Freeboard <br />Capacity <br />Class B w/o <br />Freeboard <br />Capacity <br />Class B w/ <br />Freeboard <br />Design Discharge: <br />26.09 cfs <br />20.00% <br />26.09 cfs <br />Depth: <br />0.65 ft <br />1.65 ft <br />1.11 ft <br />2.11 ft <br />Top Width: <br />15.92 ft <br />21.92 ft <br />18.68 ft <br />24.68 ft <br />Velocity: <br />2.86 fps <br />1.53 fps <br />X- Section Area: <br />9.13 sq It <br />17.07 sq ft <br />Hydraulic Radius: <br />0.566 ft <br />0.897 ft <br />Froude Number: <br />0.66 <br />0.28 <br />Roughness Coefficient: <br />0.0503 <br />0.1281 <br />Structure #4 (Pond) <br />Sump <br />Pond Inputs: <br />Pond Results: <br />Initial Pool Elev: <br />100.00 ft <br />Initial Pool: <br />2.01 ac -ft <br />*Sediment Storage: <br />0.00 ac -ft <br />Dead Space: <br />20.00% <br />*No sediment capacity defined <br />Emeraencv SDillwa <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 100.74 ft <br />H'graph Detention Time: <br />0.38 hrs <br />Pond Model: <br />CSTRS <br />Dewater Time: <br />0.76 days <br />Trap Efficiency: <br />35.20 <br />Dewatering time is calculated from peak stage to lowest spillway <br />18 <br />Filename: WestT Pond1024.sc4 Printed 05 -31 -2010 <br />Exh. 7 -20C -100 Revision Date: 5/31/10 <br />Revision No.: TR -81 <br />