Laserfiche WebLink
• <br />C7 <br />• <br />Exhibit 7, Item 20, Table 4 <br />COLOWYO COAL COMPANY <br />CFniMFNTATIr)N PnNn RtIMMARY PROPOSED PLAN - SOUTH TAYLOR MINE PLAN <br />Revision Date: 12/31/10 <br />Exh. 7 -20 -2 Revision No.: TR -81 <br />SECTION 28 <br />SECTION 21 <br />WEST TAYLOR <br />WEST TAYLOR <br />POND <br />POND <br />POND <br />POND <br />Active Mining <br />Post- mining <br />TR -81 <br />TR -81 <br />TR -88 <br />TR -81 <br />WATERSHED AREA (acres): <br />Disturbed <br />0.0 <br />Sec.21 Pond <br />109.5 <br />0.0 <br />Postmining Topsoiled and Seeded <br />40.2 <br />no longer <br />0.0 <br />104.0 <br />Undisturbed <br />252.7 <br />req'd and <br />159.4 <br />219.5 <br />1 -2 Year Reclamation <br />28.1 <br />will not be <br />0.0 <br />73.2 <br />3+ Year Reclamation <br />33.8 <br />built <br />0.0 <br />364.9 <br />354.80 <br />268.9 <br />761.6 <br />Total Area Draining to Pond <br />Excluded <br />0.0 <br />478.4 <br />0.0 <br />354.80 <br />747.30 <br />761.60 <br />Total Watershed Area <br />POND PARAMETERS: <br />Upstream Toe Elevation Original Ground <br />7058.0 <br />7456.0 <br />7456.0 <br />Principal Spillway Invert Elevation <br />7071.0 <br />7471.0 <br />7471.0 <br />Emergency Spillway Invert Elevation <br />7077.0 <br />7476.0 <br />7476.0 <br />Top of Embankment <br />7082.0 <br />7481.0 <br />7481.0 <br />Storage Volume Below Emergency Spillway Invert (ac -ft) <br />8.31 <br />5.64 <br />5.64 <br />Storage Volume Below Principal Spillway Invert (ac -ft) <br />3.65 <br />2.90 <br />2.90 <br />Storage Volume Below Lowest Spillway Perforation (ac -ft) <br />1.67 <br />1.77 <br />1.77 <br />Principal Spillway Parameters: <br />Type <br />Perforated Riser <br />Perforated Riser <br />Perforated Riser <br />Riser Diameter (in) <br />18.0 <br />18.0 <br />18.0 <br />Riser Height (ft) <br />6.6 <br />16.0 <br />16.0 <br />Barrel Diameter (in) <br />18.0 <br />18.0 <br />18.0 <br />Elevation of Lowest Perforation(s) (ft) <br />7064.5 <br />7468.0 <br />7468.0 <br />Size of Perforation(s) (in) <br />3.0 <br />3.0 <br />3.0 <br />Number of Perforations per Elevation <br />2.0 <br />2.0 <br />2.0 <br />Emergency Spillway Parameters: <br />Type <br />Trapezoidal <br />Trapezoidal <br />Trapezoidal <br />Diameter (in) <br />N/A <br />N/A <br />N/A <br />Bottom Width (ft) <br />30.0 <br />30.0 <br />30.0 <br />Crest Length (ft) <br />30.0 <br />30.0 <br />30.0 <br />Side Slopes'z'H:1V (ft) <br />2.0 <br />2.0 <br />2.0 <br />HYDROLOGIC /HYDRAULIC PARAMETERS: <br />Base Flow Rates (cfs) <br />0.00 <br />0.00 <br />0.00 <br />10 -Year, 24 -Hour Storm Event: <br />Precipitation (in) <br />1.80 <br />1.80 <br />1.80 <br />Runoff Volume (ac -ft) <br />3.58 <br />5.81 <br />12.35 <br />Principal Spillway Peak Discharge (cfs) <br />1.98 <br />12.09 <br />16.80 <br />Emergency Spillway Peak Discharge (cfs) <br />0.00 <br />0.00 <br />0.00 <br />Peak Surface Water Stage Elevation (ft) <br />7069.40 <br />7473.02 <br />7474.89 <br />Spillway Design Storm <br />100 yr /24 hr <br />25 yr /24 hr <br />25 yr /24 hr <br />Precipitation (in) <br />2.70 <br />2.30 <br />2.30 <br />Runoff Volume (ac -ft) <br />10.70 <br />9.99 <br />23.05 <br />Principal Spillway Peak Discharge (cfs) <br />16.32 <br />18.70 <br />22.00 <br />Emergency Spillway Peak Discharge (cfs) <br />0.00 <br />0.00 <br />56.81 <br />Peak Surface Water Stage Elevation (ft) <br />7073.28 <br />7475.83 <br />7476.90 <br />Pond Freeboard (ft) <br />8.72 <br />1 <br />5.17 <br />4.10 <br />SEDIMENT LOADING PARAMETERS (10 -Year, 24 -Hour Event): <br />Storm Predicted Peak Sediment Concentration (in, mg /1) 163,309 <br />343,608 <br />14,755 <br />Storm Predicted Peak Sett1. Solids, (out, mVl) 0.0 <br />0.0 <br />0.0 <br />Predicted Annual Sediment Loading (ac -ft) 0.21 <br />0.1 <br />0.02 <br />Max. sediment storage elevation (ft) 7060.00 <br />7459.0 <br />7459.0 <br />Available Sediment Storage Volume (ac -ft) 0.49 <br />0.18 <br />0.18 <br />Predicted Number of years to max sed stor. El 2.3 <br />1.8 <br />9.0 <br />Revision Date: 12/31/10 <br />Exh. 7 -20 -2 Revision No.: TR -81 <br />