Laserfiche WebLink
Sample <br />No <br />Date <br />Tested <br />Location <br />Concrete Strength <br />7 Day <br />(psi) <br />7 Day <br />% <br />28 Day <br />(psi) <br />28 Day <br />(psi) <br />28 Day <br />Average <br />28 Day <br />% <br />Pass /Fail <br />SC-44 <br />7/20/2009 <br />UG #3004, Concrete Plug <br />3990 <br />99.8 <br />5250 <br />5230 <br />5240 <br />131 <br />PASS <br />SC -52 <br />3/5/2010 <br />UG #3006/ #3007, 1' ASG <br />4260 <br />106.5 <br />5820 <br />5910 <br />5865 <br />147 <br />PASS <br />SC -53 <br />3/5/2010 <br />UG #3006/ #3007, 1' BFG <br />4450 <br />111.3 <br />5910 <br />5950 <br />5930 <br />148 <br />PASS <br />SC -54 <br />3/26/2010 <br />UG #3012, Center of Plug <br />3050 <br />76.3 <br />4290 <br />4450 <br />4370 <br />109 <br />PASS <br />SC -55 <br />3/26/2010 <br />UG #3012, Center of Plug <br />3920 <br />98.0 <br />4880 <br />4920 <br />4900 <br />123 <br />PASS <br />• <br />• <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Concrete Observation & Testing Results <br />Page 1 of 1 <br />ame <br />