Laserfiche WebLink
3 LAYERS <br />OF GEOGRID (INSTALLED IN <br />ACCORDANCE TO DESIGN <br />SPECIFICATIONS) <br />LEGEND: <br />zim/ <br />STRUCTURAL FILL <br />NOTES: <br />1) 6" MINIMUM SELECT STRUCTURAL FILL <br />BETWEEN GEOGRID LAYERS <br />EXISTING GROUND SURFACE OR <br />SOIL LINER FILL SUBGRADE SURFACE <br />COMPACTED FOUNDATION MATERIAL <br />SHAFT /STOPE REMEDIATION DETAIL <br />SELECT STRUCTURAL FILL <br />NTS <br />QUANTITIES: <br />450 CY <br />480 CY <br />- STRUCTURAL FILL <br />- SELECT STRUCTURAL <br />FILL COMPACTED TO 95% OF <br />ASTM D -698 <br />14,766 SF - GEOGRID (3- LAYERS) <br />CLIENT <br />CRIPPLE CREEK & VICTOR GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITLE <br />REMEDIATION OF UNDERGROUND WORKINGS <br />AND CONSTRUCTION OF NO. 3009 & 3010 <br />DETAIL SECTION <br />EARTH AND ENVIRONMENTAL <br />DESIGNED BY CHECKED BY <br />DATE <br />DRAWN BY CMT APPROVED BY 4/27/10 <br />CARD FILENAME FUME No. REV <br />1125F330 l 1 l A <br />