Laserfiche WebLink
SEAM NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />(°F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(Ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />( ° F) <br />ACTUAL <br />( °F) <br />P581/P594 <br />SEOS <br />\ NEOS <br />10/05/10 <br />18:20 <br />57 <br />MA <br />114 <br />4.5 <br />850 <br />847 <br />22 <br />KL <br />• <br />TOTAL FUSION WELDED SEAM FEET <br />Notes: <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Fusion Welding Summary - 100 mil LLDPE <br />1,459.0 <br />• <br />ame <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />Page 2 of 2 <br />Technician: MA Machine Number: 114 <br />