My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (139)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (139)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
8/22/2011 11:35:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. IV, App. L.3- Pri. Geomb. Fusion Welding Sum.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEAM NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />(°F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(Ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />( <br />ACTUAL <br />(°F) <br />P277/P278 <br />NEOS <br />\ SEOS <br />08/06/10 <br />7:55 <br />57 <br />UL <br />205 <br />4.5 <br />850 <br />846 <br />46 <br />BM <br />P279/P280 <br />EEOS <br />\ WEOS <br />08/06/10 <br />8:30 <br />57 <br />UL <br />205 <br />4.5 <br />850 <br />834 <br />23 <br />BM <br />P265/P279 <br />NEOS <br />\ SEOS <br />08/06/10 <br />8:47 <br />57 <br />UL <br />205 <br />4.5 <br />850 <br />855 <br />134 <br />BM <br />P265/P280 <br />NEOS <br />\ SEOS <br />08/06/10 <br />9:15 <br />58 <br />UL <br />205 <br />4.5 <br />850 <br />847 <br />36 <br />BM <br />P283/P285 <br />NEOS <br />\ SEOS <br />08/06/10 <br />8:34 <br />58 <br />UL <br />205 <br />4.5 <br />850 <br />844 <br />106 <br />BM <br />P283/P284 <br />NEOS <br />\ SEOS <br />08/06/10 <br />8:55 <br />58 <br />UL <br />205 <br />4.5 <br />850 <br />839 <br />92 <br />BM <br />P288/P289 <br />EEOS <br />\ WEOS <br />08/06/10 <br />10:21 <br />60 <br />UL <br />205 <br />4.5 <br />850 <br />852 <br />23 <br />BM <br />DFP1 -78 <br />19' W of EEOS (DF), D -625 <br />P278/P287 <br />NEOS <br />\ SEOS <br />08/06/10 <br />10:38 <br />60 <br />UL <br />205 <br />4.5 <br />850 <br />834 <br />45 <br />BM <br />P175/P287 <br />NEEOS <br />\ SWEOS <br />08/06/10 <br />10:50 <br />60 <br />UL <br />205 <br />4.5 <br />850 <br />830 <br />21 <br />BM <br />P176/P287 <br />NEEOS <br />\ SWEOS <br />08/06/10 <br />10:53 <br />60 <br />UL <br />205 <br />4.5 <br />850 <br />852 <br />10 <br />BM <br />P176/P286 <br />NEOS <br />\ SEOS <br />08/06/10 <br />10:58 <br />60 <br />UL <br />205 <br />4.5 <br />850 <br />847 <br />15 <br />BM <br />P177/P286 <br />NEOS <br />\ SEOS <br />08/06/10 <br />11:03 <br />65 <br />UL <br />205 <br />4.5 <br />850 <br />844 <br />22 <br />BM <br />P178/P286 <br />NEOS <br />\ SEOS <br />08/06/10 <br />11:05 <br />65 <br />UL <br />205 <br />4.5 <br />850 <br />831 <br />17 <br />BM <br />P178/P288 <br />NEOS <br />\ SEOS <br />08/06/10 <br />11:07 <br />65 <br />UL <br />205 <br />4.5 <br />850 <br />820 <br />6 <br />BM <br />P179/P288 <br />NEOS <br />\ SEOS <br />08/06/10 <br />11:10 <br />65 <br />UL <br />205 <br />4.5 <br />850 <br />830 <br />23 <br />BM <br />• <br />TOTAL FUSION WELDED SEAM FEET <br />Notes: <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Fusion Welding Summary -100 mil LLDPE <br />Page 1 of 1 <br />619.0 <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />• <br />ame <br />Technician: UL Machine Number: 205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.