Laserfiche WebLink
SEAM NO. <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />(°F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(Ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />( <br />ACTUAL <br />( <br />P550/P692 <br />SEOS <br />\ NEOS <br />10/15/10 <br />10:06 <br />54 <br />JR <br />114 <br />3.5 <br />850 <br />855 <br />23 <br />BM <br />P550/P693 <br />SEOS <br />\ NEOS <br />10/15/10 <br />10:11 <br />54 <br />JR <br />114 <br />3.5 <br />850 <br />847 <br />16 <br />BM <br />P555/P693 <br />SEOS <br />\ NEOS <br />10/15/10 <br />10:14 <br />54 <br />JR <br />114 <br />3.5 <br />850 <br />861 <br />6 <br />BM <br />P555/P694 <br />SEOS <br />\ NEOS <br />10/15/10 <br />10:16 <br />54 <br />JR <br />114 <br />3.5 <br />850 <br />860 <br />23 <br />BM <br />P694/P696 <br />EEOS <br />\ WEOS <br />10/15/10 <br />10:25 <br />54 <br />JR <br />114 <br />3.5 <br />850 <br />858 <br />29 <br />BM <br />P652/P696 <br />SEOS <br />\ NEOS <br />10/15/10 <br />10:35 <br />54 <br />JR <br />114 <br />3.5 <br />850 <br />845 <br />29 <br />BM <br />• <br />TOTAL FUSION WELDED PEAM FEET <br />Notes: <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Fusion Welding Summary - 100 mil LLDPE <br />Page 10 of 10 <br />19,838.0 <br />• <br />ame <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />Technician: JR Machine Number: 114 <br />