Laserfiche WebLink
DATE <br />SAMPLE <br />NO. <br />TIME <br />MACHINE <br />NO. <br />WELD <br />TECH <br />AMBIENT AIR <br />TEMP. ( <br />MACHINE SETTINGS <br />TEST RESULTS <br />PASS' <br />FAIL <br />QA <br />MONITOR <br />REMARKS <br />MACHINE <br />TEMP. ( <br />SPEED <br />SETTING <br />INS! DEPEEL <br />OUTSIDE PEEL <br />SHEAR <br />strength <br />(PPI) <br />mode <br />strength <br />(PO) <br />mode <br />strength <br />(PO) <br />mode <br />10/13/10 <br />TF -3 <br />12:54 <br />UL <br />369 <br />48 <br />850 <br />4.4 <br />141 <br />SE1 <br />167 <br />SE1 <br />180 <br />BRK <br />P <br />BE <br />100/100 <br />175 <br />SE1 <br />163 <br />SE1 <br />10/13/10 <br />TF-4 <br />13:00 <br />JR <br />114 <br />48 <br />850 <br />4.4 <br />170 <br />SE1 <br />180 <br />SE1 <br />185 <br />BRK <br />P <br />BE <br />100/100 <br />164 <br />SE1 <br />170 <br />SE1 <br />10/14/10 <br />TF -1 <br />8:00 <br />JR <br />369 <br />33 <br />850 <br />4.0 <br />270 <br />BRK <br />P <br />CT <br />100/100 <br />206 <br />SE1 <br />96 <br />SE1 <br />10/14/10 <br />TF -2 <br />8:04 <br />UL <br />114 <br />33 <br />850 <br />4.0 <br />274 <br />BRK <br />P <br />CT <br />100/100 <br />181 <br />S <br />205 <br />SE1 <br />10/14/10 <br />TF -3 <br />12:51 <br />UL <br />114 <br />61 <br />850 <br />4.4 <br />175 <br />BRK <br />P <br />CT <br />100/100 <br />1 6 <br />SE1 <br />158 <br />SE1 <br />10/14/10 <br />TF-4 <br />13:00 <br />JR <br />369 <br />61 <br />850 <br />4.4 <br />1 <br />1 <br />164 <br />SE1 <br />191 <br />BRK <br />P <br />CT <br />100/100 <br />0 <br />SSEE1 <br />162 <br />SE1 <br />10/15/10 <br />TF -1 <br />8:10 <br />JR <br />114 <br />37 <br />850 <br />4.0 <br />192 <br />1 61 <br />243 <br />BRK <br />P <br />JL <br />100/100 <br />188 <br />SE1 <br />10/16/10 <br />TF -1 <br />8:46 <br />JR <br />114 <br />34 <br />850 <br />4.0 <br />187 <br />SE1 <br />188 <br />SE1 <br />252 <br />BRK <br />P <br />JL <br />100/100 <br />180 <br />SE1 <br />181 <br />SE1 <br />• <br />Notes: <br />1 . ppi = pounds per i nch <br />2. Time in Military Time <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Fusion Trial Seam Summary -100 mil LLDPE <br />Page 8 of 8 <br />• <br />ame <br />