Laserfiche WebLink
PANEL <br />NUMBER <br />ROLL NUMBER <br />DEPLOYMENT <br />DATE <br />AMBIENT AIR <br />TEMPERATURE <br />, <br />(F) <br />AVERAGE <br />SHEET <br />THICKNESS <br />(MILS) <br />QA <br />MONITOR <br />VISUAL <br />OBSERVATION <br />REMARKS <br />APPROX. DEPLOYMENT <br />DEPLOYMENT QUANTITIES <br />ROLL <br />PREFIX <br />NUMBER <br />ROLL <br />SUFFIX <br />OVERLAP <br />(IN) <br />LENGTH <br />(Fr) <br />WIDTH <br />(Fr) <br />AREA <br />(FT <br />CUMMULATIVE <br />QUANTITY (FT <br />P -691 <br />LS1 -0 -10 <br />6022 <br />3 <br />10/14/10 <br />61 <br />106 <br />JL <br />OK <br />Rectangle <br />6 <br />139 <br />22.5 <br />3,128 <br />1,618,284 <br />P -692 <br />LS1 -0 -10 <br />6022 <br />3 <br />10/14/10 <br />61 <br />107 <br />JL <br />OK <br />Rectangle <br />6 <br />141 <br />22.5 <br />3,173 <br />1,621,457 <br />P -693 <br />LS1 -0 -10 <br />6018 <br />3 <br />10/14/10 <br />60 <br />106 <br />JL <br />OK <br />Rectangle <br />6 <br />142 <br />22.5 <br />3,195 <br />1,624,652 <br />P -694 <br />LS1 -0 -10 <br />6018 <br />3 <br />10/14/10 <br />60 <br />106 <br />JL <br />OK <br />Rectangle <br />6 <br />141 <br />22.5 <br />3,173 <br />1,627,824 <br />P -695 <br />LS1 -0 -10 <br />6021 <br />3 <br />10/14/10 <br />60 <br />106 <br />JL <br />OK <br />Rectangle <br />6 <br />43 <br />1.5 <br />65 <br />1,627,889 <br />P -696 <br />LS1 -0 -10 <br />6022 <br />3 <br />10/14/10 <br />60 <br />106 <br />JL <br />OK <br />Rectangle <br />6 <br />3 <br />32.0 <br />96 <br />1,627,985 <br />• <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Panel Deployment Summary -100 mil LLDPE <br />• <br />amec <br />Notes: <br />1. Panels deployed and trimmed as pie pieces are measured from top at center, down. <br />Page 18 of 18 <br />