Laserfiche WebLink
PART 11 - OPERATION AND MAINTENANCE <br />4.0 OPERATION PLANS AND CRITERIA <br />4.1 Levee <br />4.2 Flood Warning System <br />4.3 Flood operations Plan <br />5.0 MAINTENANCE PLATS AND CRITERIA <br />5.1 <br />Levee <br />5.2 <br />Project Control Markers <br />Future Modifications to Levee <br />5.4 <br />Governmental hum unit <br />Funding Requirements <br />FIGURES <br />I Project Site Plan <br />2 Drainage B asin <br />Ownership of Property <br />4 I -year F Food l in <br />Typical Section WLeee <br />Profile of Levee <br />Tantra Lateral Ditch Closure Device <br />Seep Locations <br />APPENDICES <br />A Annul Inspection and Maintenance Report/Checklist <br />University of Colorado at Boulder Resolution Adopting Operations and <br />Maintenance Manual <br />Engineers Project Certification <br />Cooperation With Others <br />Flood Operations Plan <br />F Project Photographs <br />G Specifications for Additional or Replacement Fill Material <br />References <br />(0075757 DV <br />