Laserfiche WebLink
Raising of the <br />Lower End of the Upstream <br />Reach of University Levee <br />Stations 101 +00 to 112 +00 <br />May 2008 <br />Specifications for this maintenance project to raise the <br />Levee at the lower end of the upstream reach were <br />prepared by CTL /Thompson, Inc. (see Exhibits I and II <br />attached to CTL/Thompson I s March 12, 2008 letter in <br />Appendix E). The results of the compaction tests are <br />contained i CTL/Thompson I s letter dated May 16, <br />2008 (see Appendix E). <br />Photographs i this section were taken by Les Botham, <br />Robert Sayre, and Scott Aschenbrenner <br />