My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-19_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2011-08-19_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:37:04 PM
Creation date
8/22/2011 8:57:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
8/19/2011
Doc Name
Reclamation Cost Update (Memo)
From
Janet Binns
To
Rob Zuber
Type & Sequence
RN6
Email Name
JHB
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />1 <br />3400.00 <br />1.00 <br />3.00 <br />4.00 <br />2665 <br />1.376 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />1 <br />3400.00 <br />-1.00 <br />3.00 <br />2.00 <br />2905 <br />1.199 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 061 <br />Return Route: <br />Haul Time: <br />Return Time: <br />1.376 <br />1.199 <br />Total Truck Cycle Time: 4.443 <br />Unit cost: $1.418 /LCY Total job cost: $689.35 <br />minutes <br />minutes <br />minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 364.80 LCY/Hour Adjusted for job efficiency: 302.79 LCY/Hour <br />Truck Unit Production <br />87.69 LCY /Hour Adjusted for job efficiency: 72.78 LCY/Hour <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 291.13 LCY/Hour <br />Adjusted single truck/loader team production: 291.13 LCY/Hour <br />Adjusted multiple truck/loader team production: 291.13 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 1.67 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.