My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-19_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2011-08-19_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:37:04 PM
Creation date
8/22/2011 8:57:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
8/19/2011
Doc Name
Reclamation Cost Update (Memo)
From
Janet Binns
To
Rob Zuber
Type & Sequence
RN6
Email Name
JHB
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Backfill Pit B (check remainng volume 2010 ARR) <br />Site: Keenesburg Strip Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />05A <br />8/15/2011 <br />JHB <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />State: Colorado <br />County: Weld <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $1,681.01 <br />MATERIAL QUANTITIES <br />Initial volume: 265,372 <br />Loose volume: 298,172 <br />HOURLY PRODUCTION <br />2,850 lbs /LCY <br />Sand - Damp <br />75,000 pounds <br />26.32 LCY <br />SCRAPER TEAM WORK <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />Cat D9R - 9SU (2005) <br />NA <br />CAT 14H <br />Water Tanker, 3,500 Gal. <br />CCY <br />LCY <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.124 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />26.32 <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: CO28 -05a <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />100 <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$91.74 <br />NA <br />$49.19 <br />NA <br />$34.52 <br />$10.94 <br />Operating cost/hour: <br />$202.41 <br />NA <br />$117.89 <br />NA <br />$13.93 <br />$7.58 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$38.67 <br />NA <br />$38.49 <br />NA <br />$38.49 <br />$38.70 <br />Unit Subtotals: <br />$332.82 <br />NA <br />$205.56 <br />NA <br />$86.95 <br />$57.22 <br />Number of Units: <br />4 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,331.28 <br />Support: <br />$205.56 <br />Maint: <br />$144.17 <br />Task description: Backfill Pit B (check remainng volume 2010 ARR) <br />Site: Keenesburg Strip Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />05A <br />8/15/2011 <br />JHB <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />State: Colorado <br />County: Weld <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $1,681.01 <br />MATERIAL QUANTITIES <br />Initial volume: 265,372 <br />Loose volume: 298,172 <br />HOURLY PRODUCTION <br />2,850 lbs /LCY <br />Sand - Damp <br />75,000 pounds <br />26.32 LCY <br />SCRAPER TEAM WORK <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />Cat D9R - 9SU (2005) <br />NA <br />CAT 14H <br />Water Tanker, 3,500 Gal. <br />CCY <br />LCY <br />Cat Handbook <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.124 <br />Division of Reclamation, Mining & Safety <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />24.00 <br />34.00 <br />29.00 <br />26.32 <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: CO28 -05a <br />Maintenance Equipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.