Laserfiche WebLink
Task description: Final grade facilities (8 ac.) and access rd. (29 ac) <br />Site: Keenesburg Strip Mine <br />PROJECT IDENTIFICATION <br />Task #: 054 State: Colorado <br />Date: 8/17/2011 County: Weld <br />User: JHB <br />Cost Breakdown: <br />Unit cost: <br />Agency or organization name DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14H <br />Ripper Attachment: Multi -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />MOTOR GRADER WORK <br />$38.08 <br />$55.73 <br />$1.77 <br />$38.86 <br />$134.44 <br />Total Fleet Cost/Hour: $136.21 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 37.00 <br />Source of estimated acreage: 2008 ARR <br />Permit Action: RN6 PermitlJob #: C1981028 <br />Utilization % <br />NA <br />100 <br />50 <br />NA <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.25 mph <br />Selected Application: Finish grading (0 -2.5 mph) - 1.25 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 1.5303 acres/hour <br />Job Condition Correction Factors Site Altitude: 4000 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (lsh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 1.3773 acres/Hour <br />Adjusted Hourly Fleet Production: 1.3773 acres/Hour <br />$97.61 per acre <br />Abbreviation: None <br />Filename: CO28 -054 <br />Horsepower: 215 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />acres <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 26.86 Hours <br />Total job cost: $3,612.00 <br />CIRCES Cost Estimating Software <br />