Laserfiche WebLink
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(nun) <br />1 <br />600.00 <br />0.00 <br />8.00 <br />8.00 <br />1131 <br />0.58 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />600.00 <br />0.00 <br />8.00 <br />8.00 <br />1931 <br />0.41 <br />Scraper Worksheet Cont'd Task # 033 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Return Route: <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Haul Route: <br />Haul Time: <br />Unit cost: $0.774 /LCY Total job cost: $3,796.26 <br />Site Altitude: 4000 feet <br />0.58 minutes <br />Return Time: 0.41 minutes <br />Total Scraper team cycle time: 2.59 minutes <br />Adjusted for job conditions: 1,011.99 LCY /Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,011.99 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,011.99 LCY /Hour <br />Unadjusted unit production/hour: 1,219.26 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.85 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 033 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Return Route: <br />Net Correction: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: Soft, rutted dirt, no maintenance or water, 4" tire penetration 8.0 <br />Haul Route: <br />Haul Time: <br />Unit cost: $0.774 /LCY Total job cost: $3,796.26 <br />Site Altitude: 4000 feet <br />0.58 minutes <br />Return Time: 0.41 minutes <br />Total Scraper team cycle time: 2.59 minutes <br />Adjusted for job conditions: 1,011.99 LCY /Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,011.99 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,011.99 LCY /Hour <br />Unadjusted unit production/hour: 1,219.26 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.85 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />