Laserfiche WebLink
Task description: Push topsoil to powder magazine <br />Site: Keenesburg Strip Mine <br />PROJECT IDENTIFICATION <br />Task #: 018 State: Colorado <br />Date: 8/19/2011 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $205.56 <br />Total Fleet Cost/Hour: $205.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 370 <br />Swell factor: 1.060 <br />Loose volume: 392 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />0% <br />4,000 feet <br />Material weight: 2,850 lbs /LCY <br />Weight description: Sand - Dam <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />$49.19 <br />$117.89 <br />$0.00 <br />$38.49 <br />60 feet <br />1,872.0 LCY /hr <br />BULLDOZER WORK <br />Permit Action: RN6 Permit/Job #: C1981028 <br />0.750 <br />1.000 <br />1.000 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: CO28 -018 <br />CIRCES Cost Estimating Software <br />