My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-22_REPORT - M1981058
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981058
>
2011-08-22_REPORT - M1981058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:35 PM
Creation date
8/22/2011 7:57:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981058
IBM Index Class Name
REPORT
Doc Date
8/22/2011
From
Thomas F & Ginger L Latham
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tvouce of thou w con ivitmng vperauons <br />11lConstruction Materials Annual Report <br />Permittee Name: - Thomas F and Gi nur T; Tatham <br />Permit No.: M 1981 -05'3 • <br />Operation Name: TMhec111P. GravP1 Pi t <br />Anniversary Date: September 7th, 2010 <br />Total: <br />$791.00 <br />1. a. Permitted acreage: 23 b. County where mine is located: Mesa <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does the mine operate MORE or LESS than 180 days per year? _ MORE <br />3. Does this minehave a phased reclamation plan? <br />4. Total acres affected during the report year: * <br />5. Total acres reclaimed for the report year:* <br />6. Total number of acres in topsoil 'replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species & seeding rate for report year on back <br />8. For non - phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers; organic material or soil conditioners <br />used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* <br />11. COMMENTS: No Changes Since Last Map Sent In. <br />• 0 <br />YES <br />23 <br />0 <br />0 <br />0 <br />0 <br />0. <br />0 <br />23 <br />* Please show the location of the acreage for items 4 — 6. on your map * *. Indicate the phases of the reclamation <br />which have been completed, correlated with your timetable. For phased operations show dates extraction <br />ceased and dates reclamation began... <br />** NOTE: If there have not been any changes since the last annual report and you previously submitted a map <br />which correctly depicts the current acreage in items 2 through 6, then a new map is unnecessary. However, this <br />must be stated above. <br />Signature: ' 41& Date: 3 Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: •Joe - C Baxter:. Phone: (719) 489 -3385 <br />Company: Kirkland Construction FAX NO: (719) 489 -2268 <br />Address: Pn_ Box 5S0 <br />�. Rye, Colorado 8.1069 <br />Federal Tax ID No. or Social Security No.: illga <br />
The URL can be used to link to this page
Your browser does not support the video tag.