Laserfiche WebLink
Figure 4 <br />Water handling Schematic <br />Water Returned U/G For <br />LNG DdOing & Dust Control <br />3 <br />Groundwater In Zone <br />Around New Decline Wi 0 <br />Be Meteoric And Seasonal <br />Directed Of Mining <br />Campbell <br />Mountain <br />Formation <br />3 <br />=rag (Sediment Traps) <br />Hydrology Is "FreeturetknJ'. Expected Main <br />Conduit For Groundwater Is Contact Between <br />Crede:d Campbell Mountain Formations <br />Water Can Be <br />`RebaOed for UlG <br />Ddtting & <br />oust Control <br />HANDLING OF U/G WATER HANDLING OF U/G WATER ON SURFACE <br />11 <br />Portal Bench Tank In <br />Insulated Bullring <br />Pipeline <br />WATER HANDLING <br />SCHEMATIC <br />(Draft - Not To Scale) <br />6/24/11 <br />Lined (30.40 m0) <br />Holding Pond (p Surface <br />Facility (aerated to prevent <br />freezing) <br />r Pump House <br />Water For <br />Surface Drilling <br />& Dust CA <br />Surge To Lined (3640 mg) <br />Holding Pond ® Reclaimed <br />Tailings 02 <br />Water hauled by truck f Evaporation <br />1 1 <br />Water Sprays <br />To Promote <br />Evaporation In <br />Summer <br />//-- Regional Groundwater <br />W { Rote miaow gic Surface @ 9170 ft Level <br />1 <br />1 <br />i <br />