Laserfiche WebLink
• <br />TOTAL FUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Secondary Geomembrane Fusion Welding Summary - 100 mil LLDPE <br />• <br />ame <br />19,332.0 <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />** Seams not covered by trial seaming - Approved by certifying engineer <br />Page 8 of 8 <br />Technician: JA Machine Number: 369 <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />( °F) <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />00 <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />SEAM NO <br />FROM <br />\ TO <br />SETTING <br />(F) <br />ACTUAL <br />( <br />S840/S842 <br />60' W <br />\ WEOS <br />09/07/10 <br />14:56 <br />62 <br />JA <br />369 <br />4.7 <br />850 <br />847 <br />6 <br />JM <br />S435/S843 <br />EEOS <br />\ 16' W <br />09/08/10 <br />10:30 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />847 <br />16 <br />AD <br />16' W of EFOS (FMI. D -1978 <br />S435/S843 <br />16' W <br />-\ WEOS <br />09/08/10 <br />8:20 <br />51 <br />JA <br />369 <br />4.7 <br />850 <br />848 <br />124 <br />AD <br />S844/S845 <br />EEOS <br />\ WEOS <br />09/08/10 <br />8:48 <br />51 <br />JA <br />369 <br />4.7 <br />850 <br />849 <br />140 <br />AD <br />DF -203 <br />68' W of EEOS (DR D -1974 <br />S847/S848 <br />EEOS <br />\ WEOS <br />09/08/10 <br />9:28 <br />54 <br />JA <br />369 <br />4.7 <br />850 <br />846 <br />54 <br />AD <br />S848/S849 <br />EEOS <br />\ WEOS <br />09/08/10 <br />9.47 <br />54 <br />JA <br />369 <br />4.7 <br />850 <br />847 <br />36 <br />AD <br />S848/S850 <br />EEOS <br />\ WEOS <br />09/08/10 <br />9 52 <br />54 <br />JA <br />369 <br />4.7 <br />850 <br />848 <br />12 <br />AD <br />S442/S847 <br />EEOS <br />\ WEOS <br />09/08/10 <br />10:20 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />846 <br />60 <br />AD <br />S846/S852 <br />EEOS <br />\ WEOS <br />09/08/10 <br />11:08 <br />59 <br />JA <br />369 <br />4.7 <br />850 <br />846 <br />141 <br />AD <br />S842/S853 <br />EEOS <br />\ WEOS <br />09/08/10 <br />11:35 <br />59 <br />JA <br />369 <br />4.7 <br />850 <br />845 <br />21 <br />AD <br />S842/S854 <br />EEOS <br />\ WEOS <br />09/08/10 <br />11:57 <br />59 <br />JA <br />369 <br />4.7 <br />850 <br />843 <br />118 <br />AD <br />DF -205 <br />58' W of EFOS (DR. D -2007 <br />S839/S861 <br />EEOS <br />\ WEOS <br />09/08/10 <br />13:40 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />846 <br />56 <br />AD <br />S855/S856 <br />EEOS <br />\ WEOS <br />09/08/10 <br />13:53 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />852 <br />40 <br />AD <br />S856/S857 <br />EEOS <br />\ WEOS <br />09/08/10 <br />14:04 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />849 <br />29 <br />AD <br />S856/S858 <br />EEOS <br />\ WEOS <br />09/08/10 <br />14:09 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />848 <br />12 <br />AD <br />S857/S859 <br />EEOS <br />\ WEOS <br />09/08/10 <br />14:14 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />847 <br />30 <br />AD <br />S858/S859 <br />EEOS <br />\ WEOS <br />09/08/10 <br />14:18 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />845 <br />14 <br />AD <br />S859/S860 <br />EEOS <br />\ WEOS <br />09/08/10 <br />14:22 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />848 <br />40 <br />AD <br />S859/S861 <br />EEOS <br />\ WEOS <br />09/08/10 <br />14:37 <br />58 <br />JA <br />369 <br />4.7 <br />850 <br />846 <br />15 <br />BE <br />DF -206 <br />15' W of EEOS (DR D -2013 <br />• <br />TOTAL FUSION WELDED SEAM FEET <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Secondary Geomembrane Fusion Welding Summary - 100 mil LLDPE <br />• <br />ame <br />19,332.0 <br />Notes: <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />** Seams not covered by trial seaming - Approved by certifying engineer <br />Page 8 of 8 <br />Technician: JA Machine Number: 369 <br />