My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (159)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (159)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:29 PM
Creation date
8/19/2011 8:47:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. IV, App. J.3- Pri. Geomembrane Fusion Welding Summary.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEAM NO <br />SEAM SECTION <br />DATE <br />START <br />TIME <br />AMBIENT <br />AIR TEMP. <br />( <br />WELD <br />TECH <br />MACH <br />#. <br />SPEED <br />SETTING <br />MACHINE <br />TEMPERATURE <br />SEAM <br />LENGTH <br />WELDED <br />(Ft) <br />QA <br />MONITOR <br />DESTRUCTIVE <br />SAMPLE NO. <br />REMARKS <br />FROM <br />\ TO <br />SETTING <br />(°F) <br />ACTUAL <br />(°F) <br />P88/P89 <br />EEOS <br />\ WEOS <br />09/28/10 <br />14:35 <br />74 <br />MA <br />20590 <br />4.5 <br />850 <br />846 <br />36 <br />RL <br />P83 /P86 <br />NEEOS <br />\ SWEOS <br />09/28/10 <br />15:13 <br />73 <br />MA <br />20590 <br />4.5 <br />850 <br />851 <br />33 <br />RL <br />P83/P87 <br />NEEOS <br />\ SWEOS <br />09/28/10 <br />15:18 <br />73 <br />MA <br />20590 <br />4.5 <br />850 <br />848 <br />31 <br />RL <br />P89 /P90 <br />EEOS <br />\ WEOS <br />09/28/10 <br />15:31 <br />73 <br />MA <br />20590 <br />4.5 <br />850 <br />852 <br />30 <br />RL <br />P90/P91 <br />EEOS <br />\ WEOS <br />09/28/10 <br />16:05 <br />69 <br />MA <br />20590 <br />4.5 <br />850 <br />846 <br />24 <br />RL <br />P91/P92 <br />EEOS <br />\ WEOS <br />09/28/10 <br />16:12 <br />69 <br />MA <br />20590 <br />4.5 <br />850 <br />851 <br />20 <br />RL <br />P91/P93 <br />NEOS <br />\ SEOS <br />09/28/10 <br />16:21 <br />69 <br />MA <br />20590 <br />4.5 <br />850 <br />847 <br />23 <br />RL <br />P92/P93 <br />NEOS <br />\ SEOS <br />09/28/10 <br />16:25 <br />69 <br />MA <br />20590 <br />4.5 <br />850 <br />848 <br />9 <br />RL <br />DFP1 -17 <br />5' S of NEOS (DF), D -120 <br />P95/P96 <br />EEOS <br />\ WEOS <br />09/29/10 <br />8:19 <br />55 <br />MA <br />20590 <br />5.0 <br />850 <br />847 <br />51 <br />BE <br />P98/P99 <br />SEOS <br />\ NEOS <br />09/29/10 <br />8:43 <br />55 <br />MA <br />20590 <br />5.0 <br />850 <br />851 <br />22 <br />BE <br />P97/P98 <br />EEOS <br />\ WEOS <br />09/29/10 <br />8:52 <br />55 <br />MA <br />20590 <br />5.0 <br />850 <br />846 <br />44 <br />BE <br />P97/P99 <br />EEOS <br />\ WEOS <br />09/29/10 <br />8:59 <br />55 <br />MA <br />20590 <br />5.0 <br />850 <br />853 <br />79 <br />BE <br />P101/P102 <br />EEOS <br />\ WEOS <br />09/29/10 <br />9:13 <br />62 <br />MA <br />20590 <br />5.0 <br />850 <br />848 <br />124 <br />BE <br />P103/P104 <br />EEOS <br />\ WEOS <br />09/29/10 <br />9:35 <br />62 <br />MA <br />20590 <br />5.0 <br />850 <br />844 <br />123 <br />BE <br />P105/P106 <br />EEOS <br />\ WEOS <br />09/29/10 <br />10:10 <br />67 <br />MA <br />20590 <br />5.0 <br />850 <br />851 <br />126 <br />BE <br />DFP1 -19 <br />13' W of EEOS (DF), D -124 <br />P107/P108 <br />SEOS <br />\ NEOS <br />09/29/10 <br />10:40 <br />67 <br />MA <br />20590 <br />5.0 <br />850 <br />848 <br />23 <br />BE <br />P106/P108 <br />EEOS <br />\ WEOS <br />09/29/10 <br />10:45 <br />67 <br />MA <br />20590 <br />5.0 <br />850 <br />854 <br />5 <br />BE <br />P108/P109 <br />EEOS <br />\ WEOS <br />09/29/10 <br />10:51 <br />67 <br />MA <br />20590 <br />5.0 <br />850 <br />849 <br />4 <br />BE <br />P107/P109 <br />EEOS <br />\ WEOS <br />09/29/10 <br />10:52 <br />67 <br />MA <br />20590 <br />5.0 <br />850 <br />852 <br />122 <br />BE <br />P110/P112 <br />EEOS <br />\ WEOS <br />09/29/10 <br />11:20 <br />69 <br />MA <br />20590 <br />5.0 <br />850 <br />846 <br />19 <br />BE <br />P111/P112 <br />EEOS <br />\ WEOS <br />09/29/10 <br />11:23 <br />69 <br />MA <br />20590 <br />5.0 <br />850 <br />857 <br />108 <br />BE <br />P94/P102 <br />SEOS <br />\ NEOS <br />09/29/10 <br />11:57 <br />69 <br />MA <br />20590 <br />5.0 <br />850 <br />842 <br />22 <br />BE <br />P94/P101 <br />SEOS <br />\ NEOS <br />09/29/10 <br />12:01 <br />73 <br />MA <br />20590 <br />5.0 <br />850 <br />849 <br />23 <br />BE <br />P94/P100 <br />SEOS <br />\ NEOS <br />09/29/10 <br />12:04 <br />73 <br />MA <br />20590 <br />5.0 <br />850 <br />857 <br />22 <br />BE <br />DFP1 -21 <br />21' N of SEOS (DF), D -138 <br />P94/P99 <br />SEOS <br />\ NEOS <br />09/29/10 <br />12:07 <br />73 <br />MA <br />20590 <br />5.0 <br />850 <br />850 <br />23 <br />BE <br />P94/P97 <br />SEOS <br />\ NEOS <br />09/29/10 <br />12:11 <br />73 <br />MA <br />20590 <br />5.0 <br />850 <br />853 <br />22 <br />BE <br />• <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Fusion Welding Summary - 80 mil LLDPE <br />• <br />amec! <br />TOTAL FUSION WELDED SEAM FEET <br />Notes: <br />1,168.0 <br />1. AT = Anchor Trench; TI = East, West, North, South Tie -In; WEOS = West End of Seam; EEOS = East End of Seam; NEOS = North End of Seam; SEOS = South End of Seam <br />Page 1 of 1 <br />Technician: MA Machine Number: 20590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.