Laserfiche WebLink
DATE <br />SAMPLE <br />TIME <br />MACHINE <br />NO. <br />WELD <br />TECH. <br />AMBIENT AIR <br />TEMP. ( ° F) <br />PRE -HEAT <br />TEMP. ( ° F) <br />EXTRUDER <br />TEMP. ( ° F) <br />TEST RESULTS <br />QA <br />MONITOR <br />REMARKS <br />PEEL <br />SHEAR <br />PASS/ <br />FAIL <br />strength <br />(ppi) <br />, <br />mode <br />strength <br />( <br />1 <br />mode <br />9/29/2010 <br />TX -3 <br />13:32 <br />117 <br />JR <br />69 <br />550 <br />500 <br />134 <br />SE3 <br />144 <br />BRK <br />Pass <br />EN <br />80/80 <br />139 <br />SE3 <br />10/7/2010 <br />TX -1 <br />14:45 <br />117 <br />DL <br />61 <br />500 <br />550 <br />143 <br />SE3 <br />173 <br />BRK <br />Pass <br />JL <br />80/80 <br />144 <br />SE3 <br />• <br />Notes: <br />1. ppi = pounds per per inch <br />2. Time in Military Time <br />• <br />Cripple Creek & Victor Gold Mining Company <br />Phase 5 Valley Leach Facility <br />Primary Geomembrane Extrusion Trial Seam Summary - 80 mil LLDPE <br />Page 2 of 2 <br />• <br />amec <br />