Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O l a <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a <br />08a <br />Demo foundations /slabs <br />DEMOLISH <br />4.00 <br />$1,104.07 <br />$514.36 <br />$109.47 <br />$12,013.25 <br />$268.00 <br />$3,741.35 <br />$6,606.90 <br />$3,628.76 <br />Backfill water storage pond <br />DOZER <br />3.24 <br />Backfill talings pond <br />DOZER <br />0.69 <br />Backfill one panel <br />DOZER <br />75.70 <br />Rip plant area <br />RIPPER <br />1.55 <br />Distribute topsoil over 4 ac. maximum disturbance <br />DOZER <br />23.58 <br />Revegetate 4 ac. maximum disturbed area <br />REVEGE <br />16.00 <br />Mobilize reclamation crew /equipment <br />MOBILIZE <br />5.11 <br />SUBTOTALS: <br />129.87 <br />$27,986.16 <br />Task description: <br />Site: Eagle Mine <br />Reclamation cost estimate <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 7/27/2011 County: Moffat <br />User: DMC <br />Agency or organization name' DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMA] <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and /or administration: 5.00 <br />Permit Action: Initial Bond Permit/Job #: M2011029 <br />Abbreviation: None <br />Filename: MO29 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $565.32 <br />Performance bond: 1.05 Total = $293.85 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $2,798.62 <br />TOTAL O & P = $3,657.79 <br />CONTRACT AMOUNT (direct + 0 & P) = $31,643.95 <br />Total = <br />Total = <br />500.00 <br />$0.00 <br />$1,582.20 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $5,739.99 <br />TOTAL BOND AMOUNT (direct + indirect) = $33,726.00 <br />