My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-10_INSPECTION - M2011029
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2011029
>
2011-08-10_INSPECTION - M2011029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:46 PM
Creation date
8/18/2011 3:01:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011029
IBM Index Class Name
INSPECTION
Doc Date
8/10/2011
Doc Name
Inspection report
From
DRMS
To
Jubilee Venture, LLC
Inspection Date
8/3/2011
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Eagle Mine <br />PROJECT IDENTIFICATION <br />Task #: 06A State: Colorado <br />Date: 7/27/2011 County: Moffat <br />User: DMC <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - 8U (2005) <br />Horsepower: 310 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,840 <br />Swell factor: 1.000 <br />Loose volume: 4,840 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />HOURLY PRODUCTION <br />Average push distance: 350 feet <br />Unadjusted hourly production: 238.9 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />0% <br />6,650 feet <br />Material weight: 1,600 lbs /LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Distribute topsoil over 4 ac. maximum disturbance <br />Permit Action: Initial Bond Permit/Job #: M2011029 <br />4 ac. 9' depth <br />Cat Handbook <br />BULLDOZER WORK <br />0.750 <br />1.200 <br />1.000 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: MO29 -06a <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.